Laserfiche WebLink
SWRCB,January 2002 Page of <br /> 6. PIPING SUMP TESTING <br /> Test Method Developed By: ❑Sump Manufacturer ❑Industry Standard ❑Professional Engineer <br /> X Other(Spec) Incon <br /> Test Method Used: ❑Pressure ❑Vacuum X Hydrostatic <br /> Other(Spec) <br /> Test Equipment Used: Incon Sump Tester Incon TS-STS Sump Test System Equipment Resolution: .002 <br /> Sump#DSL West Sump#DSL West Sump#AST Sump# <br /> STP High Flow STP Pi in Sum <br /> Sump Diameter: 42" 42" 25"X 20" <br /> Sump Depth: 69" 69" 31" <br /> Sump Material: Fiberglass Fiberglass Fiberglass <br /> Height from Tank Top to Top of 34" 32" 15" <br /> Highest Piping Penetration: <br /> Height from Tank Top to Lowest 10" 10" 22" <br /> Electrical Penetration: <br /> Condition of sump prior to testing: Dirty Dirty Dirty <br /> Portion of Sump Tested2 1/2 1/2 1/2 <br /> Does turbine shut down when <br /> sump sensor detects liquid(both ❑ Yes ❑No X NA ❑Yes ❑No X NA ❑Yes ❑No X NA ❑Yes ❑No ❑NA <br /> product and water)?* <br /> Turbine shutdown response time N/A N/A N/A <br /> Is system programmed for fail-safe ❑ Yes ❑No X NA ❑Yes ❑No X NA ❑Yes ❑No X NA ❑Yes ❑No ❑NA <br /> shutdown?* <br /> Was fail-safe verified to be <br /> operational?* ❑ yes ❑No X NA ❑Yes ❑No X NA ❑Yes ❑No X NA 11Yes ❑No F1NA <br /> Wait time between applying <br /> pressure/vacuum/water and starting 5 Minutes 5 Minutes 5 Minutes <br /> test: <br /> Test Start Time: 9:53 AM 2:06 PM <br /> Initial Reading(Ri): 4.6643" 4.7506" <br /> Test End Time: 10:08 AM 2:21 PM <br /> Final Reading(RF): 4.6644" 4.7512" <br /> Test Duration: 15 Minutes 15 Minutes <br /> Change in Reading(RF-RI): +0.0001 +0.0006 <br /> Pass/Fail <br /> Threshold or Criteria: +/-0.002 +/-0.002 <br /> eslRt ai 3 uta z r�� <br /> u 1 dS5 ?Fail X PBSS Q FAII I� Pils VI NEW- <br /> Was SSaq A I a <br /> sensor removed for testing? ❑ Yes ❑No ❑NA X Yes ❑No ❑NA X Yes ❑No ❑NA ❑Yes ❑No ❑NA <br /> Was sensor properly replaced and ❑ Yes ❑No ❑NA X Yes ❑No ❑NA X Yes ❑No ❑NA ❑Yes ❑No ❑NA <br /> verified functional after testin ? <br /> Comments—(include information on repairs made prior to testing, and recommended follow-u2 for failed tests) <br /> Diesel West was not testing due to secondary boot failure; will test after boot is replaced. <br /> R <br /> Z If the entire depth of the sump is not tested,specify how much was tested. If the answer to gny of the questions indicated with an <br /> asterisk(*)is"NO"or"NA",the entire sump must be tested. (See SWRCB LG-160) <br /> I, <br />