My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_1999-2007
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
H
>
HAMMER
>
3355
>
2300 - Underground Storage Tank Program
>
PR0508352
>
COMPLIANCE INFO_1999-2007
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/7/2021 3:22:58 PM
Creation date
6/3/2020 9:59:35 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
1999-2007
RECORD_ID
PR0508352
PE
2361
FACILITY_ID
FA0008044
FACILITY_NAME
CHEVRON STATION #1731*
STREET_NUMBER
3355
Direction
E
STREET_NAME
HAMMER
STREET_TYPE
LN
City
STOCKTON
Zip
95212
APN
12618007
CURRENT_STATUS
01
SITE_LOCATION
3355 E HAMMER LN
P_LOCATION
01
P_DISTRICT
003
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\UST\UST_2361_PR0508352_3355 E HAMMER_1999-2007.tif
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
408
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
3. PLAN REVIEW GUIDELINES <br /> a. The enclosed plan review sheet is provided for your information to assist you <br /> in interpreting our requirements for your new UST system. <br /> b. A copy of the California Underground Storage Tank Regulations may be <br /> obtained from the State Water Resources Control Board at (916) 739-4332. <br /> C. Permits and/or plan check approval may also be required by the San Joaquin <br /> Air Pollution Control District, County/City Building Department and Fire <br /> District in your respective area. <br /> d. Complete and submit the State Water Resources Control Board '"Facility(A)" <br /> and "Tank Permit (B)" application forms. <br /> e. A minimum of 3 inspections will be conducted on the UST system installation. <br /> A $35 per hour inspection fee may be charged for additional inspections or <br /> reinspection as required. <br /> L Applicant/contractor to adhere to the approval plan and any change or <br /> deviation shall be reported and approved by PHS/EHD prior to installation. <br /> g. Field inspections associated with the plan review process shall be scheduled <br /> (48) hours in advance. <br /> If you need further assistance,or wish to schedule an appointment to discuss the plan review <br /> or field inspection, please contact our Underground Storage Tank Staff at (209) 468-3420. <br /> 2 <br />
The URL can be used to link to this page
Your browser does not support the video tag.