Laserfiche WebLink
TT MONITORING P11OCEDURE*0GWW <br /> UNDE�GR* STORAGE TANK MONITORING <br /> This monitoring program must kept at the UST location at all times. The information on this monitoring <br /> program are conditions of the operating pern-it. The perrnit holder must notify San Joaquin County <br /> Environmental Health Division,phone(209)468-3420 within 30 days of any changes to the monitoring <br /> Procedures,unless required to obtain approval before making the change. <br /> Required by Sections 2632(d)and 2641(h)CCR. <br /> Facility Name Chevron#208118 <br /> Facility Address 3355 Hammer Lane, Stockton, CA 95212 <br /> A. Describe the frequency of performing the monitoring: <br /> Tank: Continuous Annular Dace Monitor <br /> Piping: Continuous Line Pressure Monitor <br /> B. What methods and equipment, identified by name and model, will be used for <br /> performing the monitoring <br /> Tank: Veeder-Root TLS-350 Series 8470 <br /> Piping: Veeder-Root TLS-350 PLL D Series 848484 <br /> C. Describe the location(s) where the monitoring will be preformed (facility plot <br /> plan should be attached): <br /> Tank Annular ;pace Monitor, Tank Fill Sumps, Tank Turbine Sumps, <br /> and Dispenser Pans. Site Plan attached. <br /> D. List the name(s) and title(s) of the people responsible for performing the <br /> monitoring and/or maintaining the equipment: <br /> ✓ Station Manager, Holly Goulart <br /> Chevron Products Company, MalntenanctR!2patch <br /> E. Reporting format for monitoring: <br /> Tank: UST Equipment Monitorlpq Log <br /> Piping: UST Equipment Monitoring Log <br /> Describe the preventive maintenance schedule for the monitoring equipment. <br /> F. Note: Maintenance must be in accordance with the manufacturers' <br /> maintenance schedule but not less than every 12 months: <br /> All equipment will be tested annually by <br /> a third party, according to the manufacturers specifications, and will <br /> complete an annual .1 p precision test. <br /> G. Describe the training necessary for the operation of the UST system, <br /> including piping and the monitoring equipment: <br /> Hazardous Materials Management Plan, Chemical Inventory and <br /> Emergency Response Procedures will be <br /> completed upon initial employment and annually there after. <br />