My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_1999-2005
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
F
>
FRANK WEST
>
120
>
2300 - Underground Storage Tank Program
>
PR0515365
>
COMPLIANCE INFO_1999-2005
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/12/2021 10:06:56 AM
Creation date
6/3/2020 9:59:41 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
1999-2005
RECORD_ID
PR0515365
PE
2361
FACILITY_ID
FA0012107
FACILITY_NAME
A TEICHERT & SON INC*
STREET_NUMBER
120
STREET_NAME
FRANK WEST
STREET_TYPE
CIR
City
STOCKTON
Zip
95206
APN
19342006
CURRENT_STATUS
01
SITE_LOCATION
120 FRANK WEST CIR
P_LOCATION
01
P_DISTRICT
001
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\UST\UST_2361_PR0515365_120 FRANK WEST_1999-2005.tif
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
458
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
1.2.8.Federal,state and local codes and regulations always 2.1.2.3.Be sure that all equipment used to lift the tank is rated <br /> take precedence over a Xerxes requirement. to handle the load.Refer to the Xerxes Tank Installation <br /> Checklist,Tank Handling Data section for tank shipping weight. <br /> 1.2.9.Xerxes must authorize—in writing and prior to tank <br /> installation—any variation to,or deviation from,this manual's 2.1.2.4.Prepare the unloading and/or storage site by removing <br /> instructions. all rocks and debris. <br /> 1.2.10.All correspondence regarding variations must be 2.1.2.5.Arrange for sandbags or tires to be used as chocks. <br /> retained for any warranty claim to be valid. (See FIGURE 2-1.) <br /> 1.2.11. If you have questions or encounter situations not <br /> covered in these installation instructions, contact technical Tie <br /> support at Xerxes Minneapolis, 612-M7-1890. Downs <br /> 1.3.DEFINITIONS <br /> Sandbags Tank Tires <br /> 1.3.1. For terms related to Xerxes tanks,see FIGURE 1-1. <br /> Lifting Lug Service Fitting <br /> Standard 4"NPT Half-Coupling <br /> Attached Collar(AC) (access to primary tank only) <br /> Manway with Fittings Monitor Fitting <br /> (acce(access <br /> Reservoir <br /> - space son ys to)nterstitial <br /> interstitial <br /> space only) FIGURE 2-1 <br /> -- 2.1.3.When hoisting the tank,take the following precautions: <br /> Spring t 2 3 4 S Anchor Strap 2.1.3.1. Use the lifting lug(s). <br /> Line 5 <br /> Location <br /> Dome Flat � Arrows <br /> Gauge Plates 2.1.3.2.Do not wrap chain or cable around the tank. <br /> Flat Number Rib (under all fittings <br /> and manways) <br /> Seam 2.1.3.3.Use guy ropes to guide the tank when needed. <br /> FIGURE 1-1 2.1.3.4.Do not roll the tank to move it. <br /> -• -. -. ® ®- ® 2.1.4.A tank larger than 12,000 gallons has multiple lifting lugs. <br /> Use all the lugs to move the tank. (See FIGURE 2-2.) <br /> 2.1. GENERAL <br /> 2.1.1.Although Xerxes corrosion-resistant tanks are rugged, <br /> care must be taken so they are not dropped or damaged during <br /> delivery,unloading and handling on the job site. <br /> AWARNING <br /> The tank is heavy and has a large surface area. the tank <br /> will roll on sloped surfaces and could be blown about by <br /> the wind. Movement of the tank could cause death, serious <br /> personal injury or property damage. <br /> 30° <br /> 2.1.2.Before the tank is unloaded or relocated on the job site Max. <br /> (and before preinstallation testing at job site),complete the <br /> following steps: <br /> 2.1.2.1.Visually inspect the entire exterior surface of the tank to <br /> make sure that no shipping or handling damage has occurred. FIGURE 2-2 <br /> Look particularly for holes,cracks or deep scrapes. <br /> 2.1.2.2.Sign the shipping papers accepting the tank as 2.1.5.Whenever a tank is stored at the site,chock it in place to <br /> delivered, prevent rolling. (See FIGURE 2-1.)Tie the tank down if high <br /> winds are expected. <br /> 2 <br />
The URL can be used to link to this page
Your browser does not support the video tag.