Laserfiche WebLink
3/8"Wire Rope <br /> <4 Live End 104 Dead End <br /> 4—Load <br /> Load—Jb- <br /> Dead Endue Live End—l� <br /> 1/2"Wire Rope <br /> 4 Live End 1014 Dead End <br /> 4—Load <br /> Load <br /> Dead End Live End— ® <br /> FIGURE 6-5 <br /> FIGURE 6-3 6.6. AUT-OF-HOLE ANCHORING <br /> 6.5.10.Turn back from thimble the exact amount of wire rope 6.6.1.The Xerxes man-out-of-hole(MOH)strapping system is <br /> specified by the manufacturer of the clips used. designed for use in installations where water is in the excavation <br /> and/or where personnel may not enter the hole because of site <br /> 6.5.11.Apply the first clip at a distance from the dead end of the restraints.An MOH strapping system can be,but need not be, <br /> wire rope that is equal to the largest width of the clip used. (See used in conjunction with Xerxes deadmen. <br /> FIGURE 64.) <br /> 6.6.2.When using the MOH strapping system,the placement of <br /> 6.5.12. For each clip,apply a U-bolt over the dead end of wire components is critical. (See FIGURE 6-6.) <br /> rope. (See FIGURE 6-4.)(Note: Live end rests in saddle.) <br /> 1St Clip 31°Clip 2nd Clip =IIIII Load Binder =IIIII <br /> Live End Thimble _ <br /> IIII <br /> =IIIII I=IIIII <br /> IIIII—I IIIII <br /> IIIII II'II-III <br /> Loop IIIII—II Strap Strap IIIII= <br /> Dead End —IIIII Tank III—IIII <br /> FIGURE 6-4IIIII=III IIIII <br /> _ Xerxes IIII MI=IIIII <br /> 6.5.13.When two clips are required,apply the second clip as IIIII—IIII Deadman IIIII <br /> near the loop or thimble as possible. (See FIGURE64.) -II I II °` 111=1111112 °`IIIII—IIII <br /> 6.5.14.When more than two clips are required,apply the IIII I=IIIII=IIIII=IIIII-IIII =IIIII-IIIII=IIIII <br /> second clip as near the loop or thimble as possible,turn nuts on =IIIII 991111 11=IIII-III)I=IIIII-IIIII-IIIII=IIIII <br /> second clip firmly,but do not tighten initially. (See FIGURE6.4.) FIGURE 6-6 <br /> 6.5.15.When more than two clips are required,space additional <br /> clips equally between the first two,take up rope slack,and 6.7.ALTERNATE ANCHORING METHODS IN WET- <br /> tighten nuts on each U-bolt evenly. HOLE INSTALLATIONS <br /> 6.7.1. In wet-hole installations,when Xerxes'preferred method <br /> 6.5.16.Tighten all hardware uniformly and follow the manufac- of man-out-of-hole anchoring is not available,the methods <br /> turer's torque specifications.Double-check the tightness once described below may be used. <br /> the anchoring system is complete. <br /> 6.7.1.1.With both methods,place the hold-down strap between <br /> 6.5.17. If forming a loop in the wire rope,a splice is required for the wire rope and the tank so that the wire rope is never in <br /> connecting the two ends together.Standard rigging practice for direct contact with the tank. <br /> splicing wire rope calls for using twice the number of clips <br /> recommended for a single-end termination.Use a minimum of 6.7.1.2.The H-shaped positioning clips around the strap are <br /> four clips for a 3/8-inch wire rope and a minimum of six clips for designed to accommodate the wire rope on top of the strap <br /> a 1/2-inch wire rope.Place the rope ends parallel to each other as shown in FIGURE 6-7 and FIGURE 6-8. <br /> and install the clips as shown in FIGURE 6-5. <br /> 14 <br />