Laserfiche WebLink
0 0 <br /> Probe and Sensor Installation Diagrams Probe and Sensor Installation <br /> 14"min.dia. <br /> manhole <br /> Cord grip <br /> Seal-off <br /> (x=to riser diameter)X"reducer 1/2-inch rigid conduit(to Console) <br /> (x=ri <br /> Minimum riser Weatherproof junction box <br /> diameter 1 inch with 1/2-inch N.P.T.threads <br /> (16 cubic inch volume minimum) <br /> Sensor cable <br /> Steel tank <br /> Sensor must rest <br /> on bottom of tank) �1 <br /> Item E.-Typical Interstitial MicroSensor Installation-Steel UST <br /> 14"min.dia. <br /> manhole <br /> I <br /> J ; <br /> 1/2"rigid conduit <br /> (to Console) <br /> Seal-off / 1/2"rigid conduit <br /> Riser "`---Weatherproof junction <br /> box(16 cubic inch <br /> MicroSensor \volume minimum) <br /> V N.P.T.threads <br /> 1"conduit <br /> Steel tank\ <br /> Riser containment <br /> senswsMiaisin eps <br /> Item F.-Typical MicroSensor Installation in Riser Containment-Steel UST <br /> Figure 5. TLS-350 Probe and Sensor Installation Diagrams-cont'd. <br /> 18 <br />