Laserfiche WebLink
SWRCB,January 2002 Page 4 <br /> 6. PIPING SUMP TESTING <br /> Test Method Developed By: F-1 Sump Manufacturer F-1 Industry Standard �X Professional Engineer <br /> ❑ Other (Specify) <br /> Test Method Used: ❑ Pressure ❑ Vacuum Hydrostatic <br /> El Other (Spec) <br /> Test Equipment Used: vplt Equipment Resolution: <br /> Sump# 1 DIE Sump# 1 DIE Sump# 2 UNL Sump# <br /> Sump Diameter: 4811 4811 4811 <br /> Sump Depth: 6511 6511 6511 <br /> Sump Material: fiberglass fiberglass fiberglass <br /> Height from Tank Top to Top of 2211 22„ 2211 <br /> Highest Piping Pentration: <br /> Height from Tank Top to Lowest 1211 1211 1211 <br /> Electrical Pentration: <br /> Condition of sump prior to testing: good good good <br /> Portion of Sump Tested: 1 2411 2411 2411 <br /> Does turbine shut down when A. <br /> sump sensor detects liquid(both ”'- x_1 ❑No�N Yes�No�N Yes�NoDN ❑Yes❑No�VV <br /> product and water)?* <br /> Turbine shutdown response time: 2-5 secs 2-5 secs 2-5 sec s <br /> Is system programmed for fail-safe � � ❑ � ❑ � <br /> shutdown?* X❑Yes N N X❑Yes N N X❑Yes N N X❑ <br /> Yes No <br /> Was fail-safe verified to be ayes ON ayes❑No❑N ayes aN]N o Yes�No❑N <br /> operational?* <br /> Wait time between applying <br /> pressure/vacuum/water and starting 5 min 5 min 5 min <br /> test: <br /> Test Start Time: 9:51 8:55 10:59 <br /> Initial Reading(Rl): 6.505 4.355 10.993 <br /> Test End Time: 10:21 9:25 11:2 9 <br /> Final Reading(RF): 6.490 4.287 10.962 <br /> Test Duration: 30 min 30 min 30 min <br /> Change in Reading(R F-Ri ): 0 0 lgph .0 0 5gph .0 0 2 gph <br /> Pass/Fail Threshold or Criteria: 05gph .05gph .05gph <br /> EMOMEEM <br /> Was sensor removed for testing? R Yes N NA - Yes N X NA Yes N NA Yes No <br /> Was sensor properly replaced and Ye�NCINA ❑Xe�N�NA❑Yes[:]No[:]NA <br /> verified functional after testing? ❑Ye N NA ❑ Y <br /> Comments— (include information on repairs made prior to testing, and recommended follow-up for failed tests) <br /> starting and ending values are taken off the vp t and used to ca u ate the GPH <br /> 1 If the entire depth of the sump is not tested,specify how much was tested.If the answer to any of the questions indicated with an <br /> asterisk(*)is "NO"or"NA",the entire sump must be tested. (See SWRCB LG-160) <br />