Laserfiche WebLink
04/18/2007 15:50 FAX 5306222301 SAVIDGE CONSTRUCTION <br /> 11.0 ICAL MOD91:O—RING <br /> All on-site personnel who may We respiratory protection will participate in a medical <br /> monitoring program. <br /> The monitoring program will consist of either a corporate annual physical ex on or <br /> a Pre-employment physical (if the employee was hired specifically for this job) which <br /> includes. <br /> - <br /> a. Medical history <br /> b. Physical exam <br /> c. Pulmonary function test <br /> Additional testing based upon each employer's requirements may be included in the <br /> exams. <br />