Laserfiche WebLink
0 <br /> Adff <br /> Page 3 of 9 for <br /> 5. SECONDARY PIPE TESTING <br /> Test Method Developed By: ❑Piping Manufacturer 9 Industry Standard ❑ Professional Engineer <br /> ❑Other(Specify) <br /> Test Method Used: 0 Pressure ❑Vacuum ❑Hydrostatic <br /> ❑Other(Specify) <br /> Test Equipment Used: Pressure Gauge Equipment Resolution: 0-30 psi <br /> Piping Run # 1 Piping Run # 2 Piping Run # 3 Piping Run # <br /> Piping Material: F.G F.G F.G <br /> Piping Manufacturer: U.K U.K U.K <br /> Piping Diameter: 4" 4" 4" <br /> Length of Piping Run: 200' 200' 200' <br /> Product Stored: Gas Gas Diesel <br /> Method and location of piping- Disp 11/12 Sump Sump <br /> run isolation: <br /> Wait time between applying <br /> pressure/vacuum/water and 0 0 0 <br /> startin test: <br /> Test Start Time: 1:20 pm 11:25 am 11:15 am <br /> Initial Reading(Ri): 5 psi 5 psi 5 psi <br /> Test End Time: 2:20 pm 12:25 pm 12:15 pm <br /> Final Reading(RF): 5 psi 5 psi 5 psi <br /> Test Duration: lhr lhr lhr <br /> Change in Reading(RF-Ri): 0 0 0 <br /> Pass/Fail Threshold or Criteria: 0 0 0 <br /> Test Result: O Pass ❑'Fail 0 Pass ❑ Fail Q Pass ❑ Fail ❑ Pass ❑ Fall <br /> Comments-(include information on repairs made prior to testing and recommended follow-up for failed tests) <br />