My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2000-2009
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
Y
>
YOSEMITE
>
1330
>
2300 - Underground Storage Tank Program
>
PR0515864
>
COMPLIANCE INFO_2000-2009
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/19/2024 2:09:22 PM
Creation date
6/3/2020 9:59:44 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2000-2009
RECORD_ID
PR0515864
PE
2361
FACILITY_ID
FA0012355
FACILITY_NAME
A&A GAS FOOD MART
STREET_NUMBER
1330
Direction
E
STREET_NAME
YOSEMITE
STREET_TYPE
AVE
City
MANTECA
Zip
95336
APN
22120053
CURRENT_STATUS
01
SITE_LOCATION
1330 E YOSEMITE AVE
P_LOCATION
04
P_DISTRICT
005
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\UST\UST_2361_PR0515864_1330 E YOSEMITE_2000-2009.tif
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
527
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
0 <br /> Adff <br /> Page 3 of 9 for <br /> 5. SECONDARY PIPE TESTING <br /> Test Method Developed By: ❑Piping Manufacturer 9 Industry Standard ❑ Professional Engineer <br /> ❑Other(Specify) <br /> Test Method Used: 0 Pressure ❑Vacuum ❑Hydrostatic <br /> ❑Other(Specify) <br /> Test Equipment Used: Pressure Gauge Equipment Resolution: 0-30 psi <br /> Piping Run # 1 Piping Run # 2 Piping Run # 3 Piping Run # <br /> Piping Material: F.G F.G F.G <br /> Piping Manufacturer: U.K U.K U.K <br /> Piping Diameter: 4" 4" 4" <br /> Length of Piping Run: 200' 200' 200' <br /> Product Stored: Gas Gas Diesel <br /> Method and location of piping- Disp 11/12 Sump Sump <br /> run isolation: <br /> Wait time between applying <br /> pressure/vacuum/water and 0 0 0 <br /> startin test: <br /> Test Start Time: 1:20 pm 11:25 am 11:15 am <br /> Initial Reading(Ri): 5 psi 5 psi 5 psi <br /> Test End Time: 2:20 pm 12:25 pm 12:15 pm <br /> Final Reading(RF): 5 psi 5 psi 5 psi <br /> Test Duration: lhr lhr lhr <br /> Change in Reading(RF-Ri): 0 0 0 <br /> Pass/Fail Threshold or Criteria: 0 0 0 <br /> Test Result: O Pass ❑'Fail 0 Pass ❑ Fail Q Pass ❑ Fail ❑ Pass ❑ Fall <br /> Comments-(include information on repairs made prior to testing and recommended follow-up for failed tests) <br />
The URL can be used to link to this page
Your browser does not support the video tag.