Laserfiche WebLink
Page 4 of 9 ro <br /> 6. PIPING SUMP TESTING <br /> Test Method Developed By: ❑Sump Manufacturer ❑ Industry Standard ❑Professional Engineer <br /> ❑ Other(Specify) <br /> Test Method Used: ❑ Pressure ❑Vacuum EI Hydrostatic <br /> ❑ Other(Specify) <br /> Test Equipment Used: Caldwell Level Change Indicator Equipment Resolution: 0.0025 <br /> EirmSump 1 Sump 2 Sump 3 Sump <br /> Sump Diameter: 46" 46" 46" <br /> Sump Depth: 71" 68" 68" <br /> Sump Material: FG FG FG <br /> Height from Tank Top to Top of 18" 18" 18" <br /> Highest Piping Penetration: <br /> Height from Tank Top to Lowest 27„ 20" 24" <br /> Electrical Penetration: <br /> Condition of sump prior to testing: Dry Dry Dry <br /> Portion of Sump Tested' 40% 40% 40% <br /> Does turbine shut down when sump <br /> sensor detects liquid(both product and ❑ Yes ❑ No ❑ NA ❑ Yes ❑ No ❑ NA ❑ Yes ❑ No ❑ NA ❑ Yes ❑ No ❑ NA <br /> water)?* <br /> Turbine shutdown response time <br /> Is system programmed for fail-safe ❑ Yes ❑ No ❑ NA ❑Yes ❑ No ❑ NA ❑ Yes ❑ No ❑ NA ❑ Yes ❑ No ❑ NA <br /> shutdown?' <br /> Was fail-safe verified to be ❑ Yes ❑ No ❑ NA ❑Yes ❑ No ❑ NA ❑ Yes ❑ No ❑ NA ❑ Yes ❑ No ❑ NA <br /> operational?* <br /> Wait time between applying <br /> pressure/vacuum/water and starting 5min 5min 5min <br /> test: <br /> Test Start Time: 1:40 pm 1:40 pm 3:30 pm <br /> Initial Reading(R): 0.0025 0.0025 0.0025 <br /> Test End Time: 2:10 pm 2:10 pm 4:00 pm <br /> Final Reading(RF): 0.0025 0.0025 0.0025 <br /> Test Duration: 1/2hr 1/2hr 1/2hr <br /> Change in Reading(RF-Ri): 0 0 0 <br /> Pass/Fail Threshold or Criteria: 1/16hr 1/16hr 1/16hr <br /> Test Result: I] Pass ❑ Fail OO Pass ❑ Fail IF] Pass Q Fail ❑ Pass ❑ Fail <br /> Was sensor removed for testing? 0 Yes ❑ No ❑ NA ® Yes ❑ No ❑ NA IRI Yes ❑ No ❑ NA ❑ Yes ❑ No ❑ NA <br /> Was sensor properly replaced after ® Yes ❑ No ❑ NA IM Yes ❑ No ❑ NA ® Yes ❑ No ❑ NA ❑ Yes ❑ No ❑ NA <br /> testing? <br /> Comments—(include information on repairs made prior to testing,and recommended follow-up for failed tests) <br /> 'If the entire depth of the sump is not tested,specify how much was tested. If the answer to any of the questions indicated with an <br /> asterisk(*)is"NO"or"NA',the entire sump must be tested. (See SWRCB LG-160) <br />