Laserfiche WebLink
Site Address: �J D Y H �/ Qn �-�� of Testing/Servicing: / D <br />F. In -Tank Gauging / SIR Equipment: ❑ check this box if tank gauging is used only for inventory control. <br />Check this box if no tank gauging or SIR equipment is installed, <br />This section must be completed if in -tank gauging equipment is used to perform leak detection monitoring. <br />Complete the followine checklist: <br />❑ Yes <br />❑ <br />No* <br />Has all input wiring been inspected for proper entry and termination, including testing for ground faults? <br />P Yes <br />❑ <br />No* <br />Were all tank gauging probes visually inspected for damage and residue buildup? <br />❑ Yes <br />❑ <br />No* <br />Was accuracy of system product level readings tested? <br />❑ Ye s❑ <br />❑ <br />No* <br />Was accuracy of system water level readings tested? <br />❑ Yes <br />® VPQ <br />❑ <br />n <br />No* <br />Airy* <br />Were all probes reinstalled properly? <br />WP P all 4- n tk. .,♦ .C_ _f_ <br />- -- --- -�--r-••_.-_ •••-- " lu.-M1IIJI GVIIlpleie4l <br />* In the Section H, below, describe how and when these deficiencies were or will be corrected. <br />G. Line Leak Detectors (LLD): ❑ Check this box if LLDs are not installed. <br />Copplete the following checklist: <br />Yes <br />L <br />❑ <br />No* <br />For equipment start-up or annual equipment ce 'kation, was a leak simulated to verify LLD performance? <br />❑ <br />N/A <br />(Check all that apple) Simulated leak rate: 3 g.p.h.; 130.1 g.p.h ; El0.2 g.p.h. <br />Yes <br />❑ <br />No* <br />Were all LLDs confirmed operational and accurate within regulatory requirements? <br />Y <br />❑ <br />No* <br />Was the testing apparatus properly calibrated? <br />Yes <br />❑ No* <br />For mechanical LLDs, does the LLD restrict product flow if it detects a leak? <br />❑ <br />N/A <br />❑ Yes <br />❑ <br />o* <br />For electronic LLDs, does the turbine automatically shut off if the LLD detects a leak? <br />N/A <br />❑ Ye <br />❑ <br />� <br />F 1 <br />s o or a ectronoc LDs, does the turbine automatically shut off if any portion of the monitoring system is disabled <br />N/A or disconnected? <br />LE33 es ❑ o* For electronic LLDs, does (lie turbine automatically shut off if any portion of the monitoring system <br />N/A malfunctions or fails a test? <br />❑ YesPQ <br />o* For electronic LLDs, have all accessible wiring connections been visually inspected? <br />N/A <br />Yes No* Were all items on the equipment manufacturer's maintenance checklist completed? <br />* In the Section H, below, describe how and when these deficiencies were or will be corrected. <br />H. Comments: <br />