Laserfiche WebLink
Monitoring System Certification - P of 3 <br />Site Address: 1330 E. Yosemite @ Highway 99 <br />F. In - Tank Gauging / SIR Equipment: <br />1:1 <br />Date of Testing/Servicing: 7/15/04 <br />pg Check this box if tank gauging is used only for inventory control. <br />❑ Check this box if no tank gauging or SIR equipment is installed. <br />This section must be completed if in -tank gauging equipment is used to perform leak detection monitoring. <br />Complete the following checklist: <br />❑ Yes <br />❑ No* <br />Has all input wiring been inspected for proper entry and termination, including testing for ground faults? <br />❑ Yes <br />❑ No* <br />Were all tank gauging probes visually inspected for damage and residue buildup? <br />❑ Yes <br />❑ No* <br />Was accuracy of system product level readings tested? <br />❑ Yes <br />❑ No* <br />Was accuracy of system water level readings tested? <br />P❑ Yes <br />❑ No* <br />Were all probes reinstalled properly? <br />❑ Yes I ❑ No* Were all items on the equipment manufacturer's maintenance checklist completed? <br />____ � _ <br />Au oc.;d,vn n ueiow, describe now and when these deficiencies were or will be corrected. <br />G. Line Leak Detectors (LLD): ❑ Check this box if LLD's are not installed. <br />Complete the following checklist: <br />pq Yes <br />❑ No* <br />For equipment start-up or annual equipment certification was a leak simulated to verify LLD performance? <br />❑ N/A <br />(Check all that apply) Simulated leak reate: iN 3 g.p.h. (1.); ❑ 0.1 g.p.h. (2.); ❑ 0.2 g.p.h. (2.). <br />Notes: 1. Required for equipment start-up certification and annual certification. <br />2. Unless mandated by local agency, certification required only for electronic LLD start-up. <br />pg Yes <br />❑ No* <br />Were all LLD's confirmed operational and accurate within regulatory requirements? <br />lg Yes <br />❑ No* <br />Was the testing apparatus properly calibrated? <br />M Yes <br />❑ No* <br />For mechanical LLD's, does the LLD restrict product flow if it detects a leak? <br />❑ N/A <br />❑ Yes <br />❑ No* <br />For electronic LLD's, does the turbine automatically shut off if the LLD detects a leak? <br />IN N/A <br />❑ Yes <br />❑ No* <br />For electronic LLD's, does the turbine automatically shut off if any portion of the monitoring system is disabled <br />pg N/A <br />or disconnected? <br />❑ Yes <br />❑ No* <br />For electronic LLD's, does the turbine automatically shut off if any portion of the monitoring system <br />Qg N/A <br />malfunctions or fails a test? <br />❑ Yes <br />❑ No* <br />For electronic LLD's, have all accessible wiring connections been visually inspected? <br />pg N/A <br />2g Yes <br />❑ No* <br />Were all items on the equipment manufacturer's maintenance checklist completed? <br />* in Section H below, describe how and when these deficiencies were or will be corrected. <br />H. Comments: <br />