Laserfiche WebLink
Monitoring System Certification - # of 3 <br />Site Address: 1330 E. Yosemite @ Highway 99 <br />D. Results of Testing / Servicing <br />Software Version Installed: 119.05 <br />Complete the following checklist: <br />0 <br />Date of Testing/Servicing: 7/15/04 <br />Ig Yes <br />M Yes <br />Yes <br />I ❑ No* <br />❑ No <br />❑ No <br />I Is the audible alarm operational? <br />Is the visual arm operational'! <br />Were all sensors visually inspected, functio—nilly tested, and continued operational? <br />Yes <br />❑ No* <br />Were all sensors installed at lowest point of secondary containment and positioned so that other equipment will <br />not interfere with their proper operation? <br />❑ Yes <br />❑ o <br />If alarms arerelayed to a remote monitoring station, is all communications equipment e.g. modem) <br />6 N/A <br />operational? <br />N Yes <br />❑ No* <br />For pressurized piping systems, does the turbine automatically shut down if the piping secondary containment <br />❑ N/A <br />monitoring system detects a leak, fails to operate, or is electrically disconnected? If yes: which sensors initiate <br />positive shut -down? (Check all that apply) IN Sump/Trench Sensors; IN Dispenser Containment Sensors. <br />Did you confirm positive shut -down due to leaks and sensor failure/disconnection? i§ Yes ❑ No <br />❑ es <br />❑ o <br />M N/A <br />or tanic systems that utilize a monitoring system as the primary tank overfill warning device i.e. no <br />mechanical overfill prevention valve is installed), is the overfill <br />warning alarm visible and audible at the tank <br />fill point(s) and operating properly? If so, at what percent of tank capacity does the alarm trigger? 0 % <br />IN Yes* <br />❑ No <br />Was any monitoring equipment replaced? If yes, identify specific sensors, probes, or other equipment replaced <br />and list the manufacturer name and model for all replacement parts in Section E, below. <br />❑ Yes <br />1 No <br />Was liquid foundinside any secon dry contamment systems designed as ary systems.(Check all that app y <br />❑ Product; ❑ Water. If yes, describe causes in Section E, below. <br />M Yes <br />❑ o <br />as monitoring system set-up reviewed to ensure proper settings. (Attach set-up reports, if applicable.) <br />Yes <br />❑ No <br />Is all monitoring equipment operational per manufacturers spec ications. <br />--10•.1 D -O W, uesciwe nuw and when these deficiencies were or will be corrected. <br />E. Comments: Replaced dispenser sensor in #1/2, all tested ok. Permit applied for on 7/29/04. Returned to <br />site later in the afternoon because the pump had gone down. Per Ray Von Flue, okay to <br />change shutdown to dispenser instead of station until repair could be made. Returned to <br />repair and re -program dispenser and was refused access by dealer. Uknown status of sensor <br />at this time. <br />