Laserfiche WebLink
Elite IV Contractors <br /> 9. SPILIJOVERFILL CONTAINMENT BOXES <br /> Facility is Not Equipped With Spill/Overfill Containment Boxes 0 <br /> Spill/Overfill Containment Boxes are Present,but were Not Tested 11 <br /> Test Method Developed By: 0 Spill Bucket Manufacturer D Industry Standard 0 Professional Engineer <br /> 0 Other(Specify) <br /> Test Method Used: 0 Pressure 11 Vacuum 0 Hydrostatic <br /> 11 Other(Specify) <br /> Test Equipment Used: Equipment Resolution, <br /> Spill Box# Spill Box# Spill Box# Spill Box# <br /> Bucket Diameter: <br /> -Bucket Depth: <br /> Wait time between applying <br /> pressure/vacuum/water and <br /> starting test: <br /> C <br /> Test Start Time: <br /> Initial Reading(Rj): <br /> Test End Time: <br /> Final Reading(RF): <br /> Test Duration: <br /> -Change in Reading(RF-Rj): <br /> Pass/Fail Threshold or <br /> Criteria: <br /> Test Result: D Pass 0 Fail 1_2 Pass D Fall D Pass 0 Fail 0 Pass 0 Fail <br /> —Comments (include information on repairs made prior to testing, and recommended follow-up for failed tests) <br /> N\/ <br />