Laserfiche WebLink
n <br />1VIFIED PKUk;RAIVI 1UU1NbUL1DA TEII IEPKM <br />UNDERGROUND STORAGE TANK <br />MONITORING PLAN - (Pae I of 2) <br />TYPE OF ACTION ® 1. NEW PLAN ❑ 2. CHANGE OF INFORMATION 490-1' <br />PLAN TYPE ❑ 1. MONITORING IS IDENTICAL FOR ALL USTs AT THIS FACILITY. 490-2, <br />(Check one item only) ❑ 2. THIS PLAN COVERS ONLY THE FOLLOWING UST SYSTEM(S): <br />I. FACILITY INFORMATION <br />FACILITY M # (Agency Use Only) <br />BUSINESS NAME (Same as Facility Name or DBA) Gas Depot 3 <br />BUSINESS SITE ADDRESS 1330 E. Yosemite l03 <br />CITY Manteca 104. <br />II. EQUIPMENT TESTING AND PREVENTIVE MAINTENANCE <br />Testing, preventive maintenance, and calibration of monitoring equipment (e -g., sensors, probes, line leak detectors, etc.) must be performed at the frequency specified <br />by the equipment manufacturers' instructions, or annually, whichever is more frequenL Such work must be performed by qualified personnel. [23 CCR §2632, 2634, 2635, 26411 <br />EQUIPMENT IS SERVICED ® 1- ANNUALLY ❑ 99.OTHER 490 <br />MONITORING E Q (Specify): 490-36, <br />MONITORING LOCATIONS <br />❑ 1. NEW SITE PLOT PLAN/MAP SUBMITTED WITH THIS PLAN 0 2. SITE PLOT PLAN/MAP PREVIOUSLY SUBMITTED [23 ccR §z632, 2634] 490 4. <br />IV TANK MONITORING IS PERFORMED USING THE FOLLOWING METHOD(S) Ill <br />1. CONTINUOUS ELECTRONIC TANK MONITORING OF ANNULAR (INTERSTITIAL) SPACE(S) OR SECONDARY CONTAINMENT VAULT(S) 490-5. <br />WITH AUDIBLE AND VISUAL ALARMS. [23 CCR §2632,2634] <br />SECONDARY CONTAINMENT IS: ® a. DRY ❑ b. LIQUID FILLED ❑ c. PRESSURIZED ❑ d. UNDER VACUUM 490.6, <br />PANEL MANUFACTURER: Veeder foot 490-7" MODEL #: TLS 350 490-8, <br />LEAK SENSOR MANUFACTURER: Veeder foot 490-9_ MODEL #(S): 409 490-10. <br />2. AUTOMATIC TANK GAUGING (ATG) SYSTEM USED TO MONITOR SINGLE WALL TANK(S). 123 ccR §26431 490-11. <br />PANEL MANUFACTURER: 490.12 MODEL #: 490-13• <br />IN -TANK PROBE MANUFACTURER: 114. MODEL #(S): 490-15. <br />LEAK TEST FREQUENCY: ❑ a. CONTINUOUS ❑ b. DAILY/NIGHTLY ❑ c. WEEKLY 490-16• <br />❑ d. MONTHLY ❑ e. OTHER (Specify): 490.17, <br />PROGRAMMED TESTS: ❑ a. 0.1 g p.h. ❑ b. 02 g p.h. [I c. OTHER (Specify): 490 1918. <br />❑ 3. MONTHLY STATISTICAL INVENTORY RECONCILIATION [23 ccR §2646.11 490-20. <br />❑ 4. WEEKLY MANUAL TANK GAUGING (MIG) [23 ccR §26451 TESTING PERIOD: ❑ a. 36 HOURS ❑ b. 60 HOURS49 49202 21. <br />❑ 5. TANK INTEGRITY TESTING PER 123 ccR §2643.11 490-23. <br />TEST FREQUENCY: ❑ a. ANNUALLY ❑ b. BIENNIALLY ❑ c. OTHER(Specify): 490-24. <br />Pte) 490-25. <br />490-26. <br />❑ 99. OTHER (Specify): 490-27. <br />V. PIPE MONITORING IS PERFORMED USING THE FOLLOWING METHOD($). (Chtakalt <br />® 1. CONTINUOUS MONITORING OF P1PE/PIPING SUMPS) AND OTHER SECONDARY CONTAINMENT WITH AUDIBLE & VISUAL ALARMS. 490-28- <br />12'zsj SECONDARY CONTAINMENT IS: ® a. DRY ❑ b. LIQUID FILLED ❑ c. PRESSURIZED ❑ d. UNDER VACUUM 490 -29 - <br />PANEL MANUFACTURER: Veeder Root 490-30" MODEL #: TLS 360 490.31. <br />LEAK SENSOR MANUFACTURER: Veeder Root 490.32 MODEL #(S): 352 STP's /208 FSUMp 490 -33 - <br />PIPING LEAK ALARM TRIGGERS AUTOMATIC PUMP (i.e., TURBINE) SHUTDOWN. ® a. YES ❑ b. NO 4W34- <br />FAILURE/DISCONNECTION OF THE MONITORING SYSTEM TRIGGERS AUTOMATIC PUMP SHUTDOWN. ® a. YES ❑ b. NO 490-35, <br />® 2. MECHANICAL LINE LEAK DETECTOR (MLLD) THAT ROUTINELY PERFORMS 3.0 g p.h. LEAK TESTS AND RESTRICTS OR SHUTS OFF 490 36. <br />PRODUCT FLOW WHEN A LEAK IS DETECTED. [23 CCR§26361 <br />MLLD MANUFACTURER(S): VMI 490-37. MODEL #(S): 99 LD 2000 490-38. <br />❑ 3. ELECTRONIC LINE LEAK DETECTOR (ELLD) THAT ROUTINELY PERFORMS 3.0 g p h. LEAK TESTS. [23 CCR§26361 490-39• <br />ELLD MANUFACTURER(S): 49°-40. MODEL #(S): 49041, <br />PROGRAMMED IN LINE LEAK TEST: ❑ & MINIMUM MONTHLY 02 g.p.h. ❑ b. MINIMUM ANNUAL 0.1 g p.h. 49042• <br />ELLD DETECTION OF A PIPING LEAK TRIGGERS AUTOMATIC PUMP SHUTDOWN. ❑ a. YES ❑ b. NO 49043. <br />ELLD FAILUREIDISCONNECTION TRIGGERS AUTOMATIC PUMP SHUTDOWN. ❑ a. YES ❑ b. NO 49044. <br />❑ 4. PIPE INTEGRITY TESTING. 49045. <br />TEST FREQUENCY: ❑ a ANNUALLY ❑ b. EVERY 3 YEARS F-1 a OTHER (Specify)4 490 46. <br />❑ 5. VISUAL PIPE MONITORING. 490-48. <br />FREQUENCY: ❑ a. DAILY ❑ b. WEEKLY❑ e. MIN. MONTHLY & EACH TIME SYSTEM OPERATED* 49049. <br />. Allowed for monitoring of unburied emergency generator fuel piping only per HSC §25251.5(bM3) <br />❑ 6 SUCTION PIPING MEETS EXEMPTION CRITERIA [23 CCR §2636(aR3)1 490.50. <br />❑ 7. NO REGULATED PIPING PER HEALTH AND SAFETY CODE, DIVISION 20, CHAPTER 6.7 IS CONNECTED TO THE TANK SYSTEM. 490-51. <br />❑ 99. OTHER (Specify) 490 s3. <br />UPCF UST -D (12/2007) -1/4 www.unidocs.org <br />