Laserfiche WebLink
77 77 <br />III`;MOIYITORING.LO,CATI , <br />locati�n of each sensor, <br />tank a <br />e monitoring is peiformed (i.e. <br />This monitoring plan must include a Site Plan showing the general and piping layouts g- currethe nt UST Monations itoring have a diagram (e.g., o ng Site Plan from a Monitoring System Certification <br />line leak detector, monitoring system control panel, etc.). If you already <br />form, Hazardous Materials Business Plan ma etc which shows all re cared information, include it with this lan <br />,, :..,.. <br />"I <br />M10 <br />V ..TANK MOI�IITORING`__`. <br />MONITORING IS PERFORMED USING THE FOLLOWING METHOD(S): (Check all that apply) <br />❑ 1. CONTINUOUS ELECTRONIC MONITORING OF TANK ANNULAR (INTERSTITIAL) SPACE(S) OR SECONDARY CONTAINMENT <br />UNDER VACUUM <br />SECONDARY <br />Mil. <br />SECONDARY CONTAINMENT IS: 8) a. RY b. LI UID FILLED ❑ c. UNDER PRESSURE ❑ M13 <br />V <br />M12• MODEL #: --- <br />PANEL MANUFACTURER: Mu. <br />Mta. MODEL #(S)• <br />LEAK SENSOR MANUFACTURER: <br />❑ 2. AUTOMATIC TANK GAUGING (ATG) SYSTEM USED TO MONITOR SINGLE WALL TANKS) M17. <br />M16. MODEL #: <br />PANEL MANUFACTURER: MlgM19' <br />. MODEL <br />IN -TANK PROBE MANUFACTURER:M210.❑ b. DAILY/NIGHTLY❑ c. WEEKLY <br />LEAK TEST FREQUENCY: ❑ a. CONTINUOUS M21. <br />❑ d. MONTHLY ❑ e. OTHER (Specify): h 0.2 M21 N,3 <br />❑ c. OTHER (Specify): ,N,a <br />PROGRAMMED TESTS: ❑ a. 0.1 g.p.h. ❑ b. g p <br />b. STATISTICAL PER 23 CCR §2646.1 <br />❑ 3. INVENTORY RECONCILIATION C]a. MANUAL PER 23 CCR §2646 ❑ <br />❑ 4. WEEKLY MANUAL TANK GAUGING (MTG) PER 23 CCR §2645 M25. <br />TESTING PERIOD: ❑ a. 36 HOURS ❑ b. 60 HOURS <br />❑ 5. INTEGRITY TESTING PER 23 CCR §2643.1 M26. M'_7• <br />TEST FREQUENCY: ❑ a. ANNUALLY ❑ b. BIENNIALLY ❑ c. OTHER (Specify): <br />❑ 6.VISUAL MONITORING DONE: ❑ a. DAILY ❑ <br />b. WEEKLY (Requires agency approval) M28. <br />❑ 99. OTHER (Specify): <br />V 'PIPEMONITORING <br />MONITORING IS PERFORMED USING THE FOLLOWING METHOD(S) (Check all that apply) <br />❑ 1. CONTINUOUS -ELECTRONIC MONITORING OF PIPING SUMP(S)/TRENCH(ES) AND OTHER SECONDARY CONTAINMENT M31. <br />a. DRY ❑ b. LIQUID FILLED ❑ c. UNDER PRESSURE ❑ -d. UNDER VACUUM <br />SECONDARY CONTAINMENT S: M35. <br />v 33. <br />M32• MODEL #: �5 <br />PANEL MANUFACTURER: M34. MODEL #(S): <br />LEAK SENSOR MANUFACTURER:[-] a. YES ❑ b. NO M36. <br />WILL A PIPING LEAK ALARM TRIGGER AUTOMATIC PUMP (i.e., TURBINE) SHUTDOWN? a. YES ❑ b. NO M37. <br />WILL FAILURFJDISCONNECTION OF THE MONITORING SYSTEM TRIGGER AUTOMATIC PUMP SHUTDOWN. [1 <br />❑ D) THAT ROUTINELY PERFORMS 3.0 g.p.h. LEAK TESTS AND RESTRICTS OR SHUTS F <br />2. MECHANICAL LINE LEAK DETECTOR (MEL <br />PRODUCT FLOW WHEN A LEAK <br />IS �Ep r „� M31. MODEL #(S): <br />MLLD MANUFACTURER(s): <br />❑ 3. ELECTRONIC LINE LEAK DETECTOR (ELLD) THAT ROUTINELY PERFORMS 3.0 g.p.h. LEAK TESTS Mot <br />M40- MODEL #: M42. <br />ELLD MANUFACTURER: <br />PROGRAMMED LINE INTEGRITY TESTS: ❑ a. MINIMUM MONTHLY 0.2 g.p.h. ❑ b. MINIMUM ANNUAL 0.1 g.p.h. H43 <br />a. YES ❑ b. NO <br />WILL ELLD DETECTION OF A PIPING LEAK TRIGGER AUTOMATIC PUMP SHUTDOWN? ❑ Mu. <br />WILL ELLD FAILURE/DISCONNECTION TRIGGER AUTOMATIC PUMP SHUTDOWN? <br />❑ a. YES ❑ b. I40 <br />❑ 4. INTEGRITY TESTINGM45. M•w_ <br />TEST FREQUENCY: ❑ <br />a. ANNUALLY ❑ b. EVERY 3 YEARS ❑ c. OTHER (Specify) •• Mar <br />E]5.VISUAL MONITORING DONE: ❑ a. DAILY ❑ b. WEEKLY* ❑ c. MIN. MONTHLY &EACH TIME SYSTEM OPERATED" per <br />SC § 5281.5(bx3) <br />• Requires agency approval • • Allowed for monitoring of unburied emergency generator fuel piping only p <br />❑ 6. PIPING IS SUCTION PIPING MEETING ALL REQUIREMENTS FOR EXEMPTION FROM MONITORING PER 23 CCR §2636(a)(3) <br />❑ 7. NO PRODUCT OR REMOTE FILL PIPING IS CONNECTED TO THE UST(s) Mos <br />(J YY.vtncatulAc..u�A <br />SJCEHD-d (07/03) -114 <br />07/23/03 <br />