My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2002-2007
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
H
>
HAMMER
>
3304
>
2300 - Underground Storage Tank Program
>
PR0516354
>
COMPLIANCE INFO_2002-2007
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/7/2021 11:44:26 AM
Creation date
6/3/2020 10:00:29 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2002-2007
RECORD_ID
PR0516354
PE
2361
FACILITY_ID
FA0012437
FACILITY_NAME
CHEVRON 352324
STREET_NUMBER
3304
Direction
W
STREET_NAME
HAMMER
STREET_TYPE
LN
City
STOCKTON
Zip
95219
APN
07120013
CURRENT_STATUS
01
SITE_LOCATION
3304 W HAMMER LN
P_LOCATION
01
P_DISTRICT
002
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\UST\UST_2361_PR0516354_3304 W HAMMER_2002-2007.tif
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
349
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
UNDERGROUNDSTORAGETANK <br />FLNIONITORINGr <br />i ® ® a <br />MONITORING OF AREAS BENEATH DISPENSER(S) IS PERFORMED USING THE FOLLOWING METHOD(S) (Check all that apply) Myo. <br />❑ 1. CONTINUOUS ELECTRONIC MONITORING OF UNDER DISPENSER CONTAINMENT (UDC) <br />PANEL MANUFACTURER: M"- MODEL M M52. <br />LEAK SENSOR MANUFACTURER: M"- MODEL #(S): M54. <br />WILL DETECTION OF A LEAK INTO THE UDC TRIGGER AUDIBLE AND VISUAL ALARMS? ❑ a. YES ❑ b. NO Mss. <br />WILL A UDC LEAK ALARM TRIGGER AUTOMATIC PUMP SHUTDOWN? ❑ a. YES ❑ b. NO M56. <br />WILL FAILURE/DISCONNECTION OF UDC MONITORING SYSTEM TRIGGER AUTOMATIC PUMP SHUTDOWN? ❑ a. YES ❑ b. NO M57- <br />2. MECHANICAL ASSEMBLY (e.g., FLOAT AND CHAIN ASSEMBLY) IN UDC TRIPS SHEAR VALVE IN CASE OF LEAK <br />ASSEMBLY MANUFACTURER: , y M58" MODEL#(S): M59• <br />❑ 3.VISUAL MONITORING DONE: ❑ a. DAILY ❑ b. WEEKLY (Requires agency approval) Mho. <br />❑ 4. NO DISPENSERS <br />❑ <br />99. OTHER (Specify) M61 <br />❑ I. WE HAVE BEEN NOTIFIED BY THE STATE WATER RESOURCES CONTROL BOARD THAT WE MUST IMPLEMENT ENHANCED LEAK M70" <br />DETECTION (ELD) FOR THE UST(S) COVERED BY THIS PLAN. PER 23 CCR §2644.1, ELD IS PERFORMED EVERY 36 MONTHS AS REQUIRED <br />IING cof' <br />REFERENCE DOCUMENTS MAINTAINED AT FACILITY (Check all that apply) Mso. <br />LN THIS UNDERGROUND STORAGE TANK MONITORING PLAN (Required) <br />2. 1& OPERATING MANUALS FOR ELECTRONIC MONITORING EQUIPMENT (Required) <br />3. Sj THE FACILITY'S BEST MANAGEMENT PRACTICES (Required as of 7/1/2004) <br />4. ❑ CALIFORNIA UNDERGROUND STORAGE TANK REGULATIONS <br />5. ❑ CALIFORNIA UNDERGROUND STORAGE TANK LAW <br />6. ❑ -STATE WATER RESOURCES CONTROL BOARD (SWRCB) PUBLICATION: "HANDBOOK FOR TANK OWNERS - MANUAL AND <br />STATISTICAL INVENTORY RECONCILIATION" <br />7. ❑ SWRCB PUBLICATION: "WEEKLY MANUAL TANK GAUGING FOR SMALL UNDERGROUND STORAGE TANKS" <br />99. ❑ OTHER (Specify): M81 <br />Pers nel �wi US I=- responsibilities are familiar with all of the above documents relevant to their job duties and can access those documents when needed. <br />By , tills facility will have a "Designated UST Operator" who has passed the operator exam administered by the International Code Council (ICC). By July <br />1, 2004, and annually thereafter, the "Designated UST Operator" will train facility employees in the proper operation and maintenance of the UST systems. This <br />training will include, but is not limited to, the following: <br />➢ Operation of the UST systems in a manner consistent with the facility's best management practices. <br />➢ The facility employee's role with regard to the leak detection equipment. <br />The facility employee's role with regard to spills and overfills. <br />➢ Whom to contact for emergencies and leak detection alarms. <br />For facility employees hired on or after July 1, 2004, the initial training will be conducted within 30 days of the date of hire. <br />IX. COMMENTS/ADDITIONAL-:INFORMATION <br />Please use this section to include any additional UST system monitoring -related information (e.g., additional information required by your local agency). Mss. <br />o <br />X: 'PERSONNEL2ESPONNSIBILITIES <br />AS OF 711/2004, THE `DESIGNATED UST OPERATOR" IDENTIFIED IN SECTION III OF THE CURRENT UST OPERATING PERMIT APPLICATION <br />FACILITY FORM WILL HAVE ULTIMATE AUTHORITY FOR PERFORMING THE MONITORING ACTIVITIES AND MAINTAINING LEAK DETECTION <br />EQUIPMENT COVERED BY THIS PLAN, AND WILL PERFORM AND DOCUMENT MINIMUM MONTHLY VISUAL INSPECTIONS OF THE FACILITY'S <br />UST SYSTEMS IN ACCORDANCE WITH 23 CCR § 2715(b). <br />R/PERA'TOR=SIGNATURE <br />�. ; <br />CERTIFICATION: I certify that the information provided herein is true and accurate to the best of my knowledge. <br />0rER/OPERATOR <br />OP _ TOR SIG REPRESENTING DATE: M91. <br />t. ❑ Owner M90. lit 2_0 <br />Operator �`� � / �}" NAME (print): M92. M93. <br />(P ) OWNER/OPERATOR TITLE: <br />& -j Ciry��tti(V (�Wtj <br />(Agency Use Only) This plan has been reviewed and: ❑ Approved ❑ Approved With Conditions ❑ Disapproved <br />Local Agency Signature: ' Date: <br />Comments/Special Conditions: <br />SJCEHD-d (07/03) - 3/4 07/23/03 <br />
The URL can be used to link to this page
Your browser does not support the video tag.