Laserfiche WebLink
Atrg 25 00 11:46a St -eve Schamaun 91 -366-8631 p.5 <br />40 4 <br />)ST SYSTEM DRAWING INFORMATION <br />1. T(rree complete sets of plans (include manufacturer's specification sheets for proposed equipment to be installed). <br />2. Plans drawn to Seale in non-eresabie print. <br />3. Plot plan to show location of tanks and all associated piping. <br />4. X Striker plates or drop tube -mounted bottom protectors illustrated below all accessible openings. <br />5. ^ Tank crass-sectiorrut diagram. <br />6• Detail of tank, associated piping, excavation and cover. <br />7. �( Tank(s) and piping approved by a nationally recognized independent testing organization. (Title 23, Chapter 16, <br />Article 3, section 2631 (b) & 26351 <br />8. Verification of product compatibility with the tank(s), piping, monitoring <br />i <br />device(s), epoxy or silicone glues, etc. <br />i <br />Manufacturer's written installation instructions for tank(s), piping, monitoring devices, etc. <br />10. At the installation site, prior to installation, a tightness test shall be performed on both primary (1) and <br />secondary (2°) containment systems before covering. (Section 2635 (a) (3) 9 (4)1 <br />11. Tank integrity test required upon completion of installation with tank in operating condition. Test results to be <br />submitted directly to PNS-EHD from the testing company or owner of facility. (Health & Safety Code, Division 20, <br />Chapter 6.7, Section 25291 (h)] <br />12_ Jaur rue rrrrue <br />13. <br />1 <br />it <br />TANK(s) To BE INSTALLED <br />.0 A. Steet-ctad with fiberglass reinfvreed plastic coatings, composites, or equivalent non-metallic exterior <br />coatings or coverings. <br />0 ) Tested at the installation si-te using an electric resistance holiday detector. <br />(2) Vacuum applied to interstitial space. <br />,r„•"_ 8. Fiberglass <br />(1) Installation instructions require an air test and soapbubbte"test prior to installation. <br />(2) Vacuum applied to interstitial space. <br />— (3) Hydrostatic annular (primary tank pressure test). <br />C. Hon -clad steel tank (Section 2635 (a) (2) (A)J <br />(1) Cathodic protection provided for entire tank, Piping and camponents (nuts, Botts, washers, <br />etc.). <br />____ (2) Field installed cathodic protection"'systems"designed and certified as adequate by a <br />corrosion specialist. <br />(3) Impressed current systems to be inspected no less then every 60 days. <br />