Laserfiche WebLink
City of Lathrop <br /> ESCP Worksheet <br /> Rev 10/19/2017 <br /> 4.3 Temporary Sediment Control BMPS <br /> Sediment control is accomplished by two ways. First,giving sediment every opportunity to settle out of <br /> projectstorm water runoff while still on the project. Second, remove sediment from surfaces that has been <br /> carried or tracked off site before it enters the municipal drains. Each perimeter sediment control. Drain inlets within 50 feet of the . . protected. <br /> track out or spdinientation onto municipal property Must be d as soontable <br /> below on the site Tflap show how you wi[l control sediment at your project. <br /> CASCIA BMP Describe the BMP to be implemented. <br /> Fact BMP Name Selected? <br /> Sheet (Check Box) If not used,state the reason why. <br /> SE-1 Temporary Silt Fence The drilling is cased,to contain any potential <br /> runoff. Straw bales will be in place in case any <br /> unanticipated water is encountered <br /> SE-2 or Sediment basin or trap(all or some of the storm water drains to a X Water will be contained with a trough for <br /> SE-3 retention pond or basin where sediment can settle out) drilling <br /> SE-5 Temporary Fiber Rolls/Straw Wattles Any potential run off will be contained by the <br /> drill rig <br /> SE-6 or Temporary Gravel Bag Berm or Sand Bag Barrier Any disturbed soil will be contained by the <br /> SE-8 drill rig and/or straw bales. <br /> SE-7 Street Sweeping(inspect roads and sidewalks daily and sweep as X Street sweeping will be completed as necessary <br /> necessary) <br /> Lodi Curb cutback(maintain a minimum of 4 inches of elevation The disturbed soil is at a lower elevation than <br /> Standard difference between the disturbed soil and the top of the existing X the road,so any disturbed soil will be <br /> curb,sidewalk,or paved surface) contained off the roadway. <br /> SE-10 Temporary Drain Inlet Protection(mandatory for any DI's within There are no DI's within 50 ft of the project <br /> 50 feet of the project) <br /> SE-13 Compost Socks/Biofilter Bags The soil disturbance will be contained within a <br /> trough directly above the borehole <br /> Lodi Stabilized Construction Exit—Constructed with aggregate at the The area is already covered in gravel,so no <br /> Standard project owner's specification,but it must be effective in trackout is expected <br /> controlling trackout. <br /> TC-2 Stabilized Construction Roadways The work is planned to stay to the side of the <br /> X roadway,and not involve work in the <br /> roadway. <br /> WM-03 Stockpile Management(stockpiles that have not been actively <br /> used in the last 14 days must be covered with an erosion control X Any soil produced from the borehole will be <br /> blanket or plastic sheeting and contained with a fiber roll or gravel containerized in a covered roll off box on site <br /> bag berm) <br /> - 9 - <br />