Laserfiche WebLink
City of Lathrop <br /> ESCP Worksheet <br /> Rev.10/I9/20I7 <br /> 4.4 Non-Storm Water Pollution Control BMPs <br /> prohibitThe City ordinances e discharge to its municipal drainage system of <br /> unpermitted construction site dewatering,saw-cutting or grinding slurries, permitted hydrotest <br /> water, chlorinated swimming pool or fountain water, concrete or paint wash out, or <br /> project;materials or other substances. On the table below, list any of the activities that may apply to your <br /> d on the site map show the location <br /> CASQA Activity Describe the SMP to be Implemented. <br /> lanne <br /> SMP Name Pd? <br /> Fact Sheet Planned? If not used,state the reason why. <br /> NS-3 Paving,Sealing,Saw-cutting,Coring,and Grinding Operations No These activities,if needed,will be done off <br /> site <br /> NS-7 Potable Water/Irrigation Testing and Discharge to the No All water will be containerized by the drill rig <br /> Municipal Drainage System <br /> NS-8 Vehicle and Equipment Cleaning Performed on Site No Vehicles will be cleaned off site <br /> NS-9& Vehicle and Equipment Fueling Performed on Site <br /> No Vehicles will be refueled off site <br /> WM-04 <br /> NS-10 Vehicle and Equipment Maintenance Performed on Site No Maintenance will be completed off site <br /> NS-12/13 Concrete,Stucco,Plaster,Tile,or Masonry Work <br /> No None of this work is planned <br /> &WM-08 <br /> WM-09 Temporary Sanitary Waste Facilities(port-a-potties) Yes There will be a porta potty present <br /> WM-01 Storage of Hazardous Materials on the Project Site(paints, Hazardous materials will not be used at this <br /> No <br /> solvents,acids,fuel,lubricants,etc.) site <br /> - 10- <br />