My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
H
>
HOWLAND
>
16777
>
2900 - Site Mitigation Program
>
PR0543548
>
COMPLIANCE INFO
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/3/2020 11:15:53 AM
Creation date
6/3/2020 10:30:27 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
COMPLIANCE INFO
RECORD_ID
PR0543548
PE
2960
FACILITY_ID
FA0024728
FACILITY_NAME
SUPER STORE INDUSTRIES LATHROP DISTRIBUTION CENTER
STREET_NUMBER
16777
STREET_NAME
HOWLAND
STREET_TYPE
RD
City
LATHROP
Zip
95330
APN
19816026
CURRENT_STATUS
01
SITE_LOCATION
16777 HOWLAND RD
P_LOCATION
07
QC Status
Approved
Scanner
TSok
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
830
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Geosyntec l' <br /> consultants <br /> Table 3: Analytical Sampling Plan for Extraction Well Testing <br /> Analyte Method Analyte Method <br /> Sulfolane APPL SOP Sulfolane Sulfate,Chloride EPA 300.0 <br /> and Nitrate <br /> EDB and DBCP DOHS TDS SM 2540C <br /> Ammonia as N EPA 350.1 Dissolved Iron and EPA 200.7 <br /> Manganese <br /> Total Organic SM5310 Phosphorus EPA 6010B <br /> Carbon <br /> The samples will be collected in laboratory supplied containers from a sampling port in the <br /> piping between the extraction well and the first temporary water storage tank. <br /> Quality assurance/quality control (QA/QC) samples will consist of one duplicate sample <br /> collected from each well. The samples will be sent to a California state certified laboratory for <br /> analysis. <br /> The analytical results will be included in the Extraction Well Installation Report. <br /> Extraction Well Installation Work Plan 10 November 30,2018 <br />
The URL can be used to link to this page
Your browser does not support the video tag.