My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
H
>
HOWLAND
>
16777
>
2900 - Site Mitigation Program
>
PR0543548
>
COMPLIANCE INFO
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/3/2020 11:15:53 AM
Creation date
6/3/2020 10:30:27 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
COMPLIANCE INFO
RECORD_ID
PR0543548
PE
2960
FACILITY_ID
FA0024728
FACILITY_NAME
SUPER STORE INDUSTRIES LATHROP DISTRIBUTION CENTER
STREET_NUMBER
16777
STREET_NAME
HOWLAND
STREET_TYPE
RD
City
LATHROP
Zip
95330
APN
19816026
CURRENT_STATUS
01
SITE_LOCATION
16777 HOWLAND RD
P_LOCATION
07
QC Status
Approved
Scanner
TSok
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
830
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Geosyntec c <br /> COIISt111�11HS <br /> 7. SCHEDULE AND REPORTING <br /> Geosyntec will prepare an Extraction Well Installation Report following completion of the field <br /> activities. The Report will include the following: <br /> • A description of the field activities and any deviations from the Work Plan; <br /> • Completed well installation diagrams, survey results, and boring logs; <br /> • Copies of laboratory analytical reports from step-test sampling and a discussion of the <br /> analytical results; <br /> • Step-test data analysis, including estimated specific capacity, well efficiency, and aquifer <br /> properties based on the results; and <br /> • Conclusions and recommendations. <br /> Fieldwork is scheduled to start on January 7, 2019, pending approval of this Work Plan by the <br /> CVRWQCB and approval of San Joaquin County drilling permits. The Extraction Well <br /> Installation Report will be completed and submitted to the CVRWQCB within 90 days following <br /> completion of field work. <br /> Extraction Well Installation Work Plan 12 November 30,2018 <br />
The URL can be used to link to this page
Your browser does not support the video tag.