Laserfiche WebLink
Geosyntec <br /> C(Ill"1111mil, <br /> sulfolane in groundwater, findings of a preliminary evaluation of potential remedial <br /> alternatives for sulfolane in the eastern Site groundwater, and details regarding the scope <br /> of the ongoing laboratory microcosm study; <br /> • Section 3 "Objectives and Rationale" describes the objectives of the pilot test, design <br /> assumptions, criteria, and considerations; <br /> • Section 4 "Pilot Test Implementation" describes the pre-field implementation activities, <br /> including updates to the health and safety documentation, permitting, access, and <br /> clearance; and the field activities to be implemented including mobilization and Site <br /> preparation, Site controls and access, well installation and development, biosparging <br /> implementation, and waste handling procedures; <br /> • Section S "Performance Monitoring and Reporting" presents the proposed groundwater <br /> performance monitoring and reporting activities; <br /> • Section 6"Schedule"presents the pilot test implementation schedule; and <br /> • Section 7"References" lists the literature references cited herein. <br /> Tables, figures, and appendices are presented at the end of the document. <br /> [n-Situ Bioremediation Pilot Test Work Plan—GSH Lathrop 2 <br />