My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WORK PLANS
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
T
>
12 (STATE ROUTE 12)
>
8751
>
3500 - Local Oversight Program
>
PR0545718
>
WORK PLANS
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/19/2024 3:48:22 PM
Creation date
6/3/2020 11:19:49 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
3500 - Local Oversight Program
File Section
WORK PLANS
RECORD_ID
PR0545718
PE
3528
FACILITY_ID
FA0005526
FACILITY_NAME
K2 LOGISTICS
STREET_NUMBER
8751
Direction
E
STREET_NAME
STATE ROUTE 12
City
VICTOR
Zip
95253
APN
05139001
CURRENT_STATUS
02
SITE_LOCATION
8751 E HWY 12
P_LOCATION
99
P_DISTRICT
004
QC Status
Approved
Scanner
LSauers
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
78
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
L <br /> SITE HEALTH & SAFETY PLAN GEOMATRIX <br /> • Nearest water.sources <br /> • Location of communication devices. <br /> f{ 9. Personnel and equipment in restricted work areas should be limited to the number <br /> necessary to perform the task at hand. <br /> 10. All wastes generated during-investigative activities at the site shall be disposed of as <br /> directed by the PM. <br /> 11. Inspect power cords for darnage'such as cuts and frays. Suspend cords only with <br /> or rope nylon plastic ties. <br /> Y 17 <br /> 12. When in doubt of your safety, it is better to overprotect. <br /> 13. Practice defensive driving. <br /> 14. If site activities include'the use of a drill rig, all an-site personnel should know the lo- <br /> cation of the"kill switch." <br /> 15.. A first-aid kit and a type ABC fire extinguisher.shall be kept at the site and/or in a <br /> field vehicle when performing field work. <br /> 6.0 AIR MONITORING <br /> k�F The following air monitoring equipment will be used. <br /> �+ ✓ _ Photoionization Detector(PID) <br /> Flame Ionization Detector(FID) <br /> Draeger Pump and Tubes (specify tubes) <br /> ✓ Combustible Gas Meter(CGM) <br /> Oxygen Meter(02) <br /> Dust(Particle)Meter <br /> Other(specify) <br /> The type and frequency of air monitoring for each work task is specified below. Air monitoring <br /> instruments will be calibrated and maintained according to manufacturer's specifications. <br /> Calibration information and air monitoring results will-be recorded in project field notes. <br /> I <br /> i <br /> �i <br /> 11fr21deptdatalPROJECT16508.0001document16508-04.doc 1 <br />
The URL can be used to link to this page
Your browser does not support the video tag.