My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SITE HISTORY
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
T
>
12 (STATE ROUTE 12)
>
13889
>
3500 - Local Oversight Program
>
PR0545719
>
SITE HISTORY
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/19/2024 3:47:36 PM
Creation date
6/3/2020 11:22:17 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
3500 - Local Oversight Program
File Section
SITE HISTORY
RECORD_ID
PR0545719
PE
3528
FACILITY_ID
FA0005335
FACILITY_NAME
CHARLES JACOBS
STREET_NUMBER
13889
Direction
W
STREET_NAME
STATE ROUTE 12
City
LODI
Zip
95240
CURRENT_STATUS
02
SITE_LOCATION
13889 W HWY 12
P_LOCATION
99
P_DISTRICT
004
QC Status
Approved
Scanner
LSauers
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
41
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
{ <br /> 22 March 2010 <br /> AGE-NC Project No. 00-0697 <br /> Page 2 of 2 " <br /> the drill rig hoist. Thereafter,the well casing void space was backfilled utilizing Portland type 11 <br /> grout (a ratio of three gallons water for every 50-pound sack of Portland cement was utilized:in <br /> preparation of the grout mixture). Each well was completely backfilled to surface grade with the <br /> Portland cement grout mixture. <br /> Monitoring wells MW-3 and MW4 were over-drilled to total depths-of 25 feet bsg using a CME-75 <br />'r HT hollow stem auger drill rig equipped with 8-inch diameter hollow stem augers.All original well <br /> construction materials were removed(including well casing, screen, filter pack,and annular seal) <br /> to ensure that no residual contamination was sealed within the abandoned borehole..The remaining <br /> borehole was then backfilled to surface grade with the Portland cement grout mixture_ <br /> Monitoring well MW-6 was fitted with a pressure tight adapter connected to a hose extending from <br /> the grout mixer.. The grout mixture was pumped into the well casing for five minutes under <br /> approximately 5-10 pounds per square inch(psi)of pressure. The well box was then removed and <br /> the well was over-drilled to five feet bsg.using a CME-75 HT hollow stem-auger drill rig equipped; <br /> with 8-inch diameter hollow stem augers.The top five feet of the well casing was then removed-arid <br /> the boring was grouted to the near surface using the portland cement grout mixture. <br /> The above referenced well construction materials,soil cuttings;and rinseate were hauled off-site for <br /> F disposal at Chemical Waste Management,Kettleman City,CA.;a copy of the non-hazardous waste <br /> manifest is included in Appendix B.if you have any questions or require further information;please <br /> contact our office at(209)467-1006. <br /> i <br /> Sincerely, <br /> Advanced GeoEnvironmental,Inc. <br />'r <br /> rsai cfo <br /> E • W t,Ww�JI�T,. . . * No.7473 <br /> Brian Millman William R. Little, <br /> Senior Project Geologist Senior Project Geologist . <br /> California Professional Geologist No. 8574 California Professional Geolo . 7473 <br /> Enclosures <br /> cc: Mr. Charlie Jacobs,Terminous Market <br /> Mr. James Barton,Central Valley.Regional,Water Quality Control Board <br /> E .ldWaced GeoEnviroomenfal,Inc. <br /> f . <br /> i <br /> 1 <br /> r <br />
The URL can be used to link to this page
Your browser does not support the video tag.