My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WORK PLANS
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
T
>
12 (STATE ROUTE 12)
>
13889
>
3500 - Local Oversight Program
>
PR0545719
>
WORK PLANS
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/19/2024 3:48:23 PM
Creation date
6/3/2020 11:24:54 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
3500 - Local Oversight Program
File Section
WORK PLANS
RECORD_ID
PR0545719
PE
3528
FACILITY_ID
FA0005335
FACILITY_NAME
CHARLES JACOBS
STREET_NUMBER
13889
Direction
W
STREET_NAME
STATE ROUTE 12
City
LODI
Zip
95240
CURRENT_STATUS
02
SITE_LOCATION
13889 W HWY 12
P_LOCATION
99
P_DISTRICT
004
QC Status
Approved
Scanner
LSauers
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
25
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
03 December 2007 <br /> AGE-NC Project No. 00-0696 <br /> Page 5 of 6 <br /> van-mounted Geoprobe 5400 direct-push probing unit equipped with 1.25-inch, stainless steel, <br /> hollow probing rods. Soil vapor samples will be obtained at depths of approximately three to four <br /> feet bsg in each boring. Samples will be collected using a Geoprobe soil vapor assembly. <br /> An expendable vapor point will be placed into a point holder at the bottom of an assembly of <br /> 1.25-inch diameterhollow drive rods.The assemblywill then be advanced to the specified depth and <br /> retracted approximately twelve inches in order to disengage the expendable point and expose a <br /> column of strata from which soil vapor can be extracted.A single use, '/4-inch diameter disposable <br /> polyethylene tubing is then attached to a tubing adapter equipped with an O-ring to ensure a vacuum- <br /> tight seal. The adapter assembly is then lowered through the center of the Geoprobe hollow drive <br /> rods to the specified depth and secured by threading into the expendable vapor point holder. <br /> Above ground,the surface around the soil vapor sampler will be sealed with a bentonite sealant to <br /> prevent ambient air intrusion. To ensure that a reliable soil-vapor sample is collected with no <br /> ambient air breakthrough down the probe rod, AGE will apply an appropriate amount of rubbing <br /> alcohol (approximately 6 to 8 ounces) to adequately wet a cotton towel; the wetted towel will be <br /> completely wrapped around the base of the probe rod where it contacts the surface and the bentonite <br /> seal. The end of the polyethylene tubing is attached by a two-way inlet port to a Tedlar bag placed <br /> inside an SKC Vac-U-Chamber(lung box)vacuum chamber. A vacuum pump attached to a purge <br /> port of the vacuum chamber is then used to purge the exposed soil column, through the sampling <br /> tubing and inlet port, until approximately three volumes of soil vapor or ambient air is evacuated <br /> through the sampling system.The vacuum chamber is then sealed and the vacuum pump is attached <br /> to a vacuum outlet port of the chamber.When vacuum is applied to the chamber,a negative pressure <br /> is created around the Tedlar bag,which inflates,allowing the soil vapor sample to enter directly into <br /> the bag via the inlet port. When the sample is collected, the negative pressure in the chamber is <br /> reduced and the sample bag is sealed,labeled,log on a chain-of-custody form,and place into a dry <br /> cooler(room temperature). Subsequently, all of the collected soil vapor samples will be delivered <br /> to a CDPH-certified laboratory for analysis of the chemical constituents listed in Section 2.4. <br /> After collection of the sample, soil vapor from the polyethylene tubing will be monitored for the <br /> presence of volatile organics using a photo-ionization detector(PID)pre-calibrated to isobutylene. <br /> 3.5. EQUIPMENT DECONTAMINATION <br /> Prior to use,all sampling tools used for sample collection will be thoroughly rinsed with clean water <br /> after being washed with a solution of Alconox. All probing rods will be cleaned prior to <br /> advancement at each probe boring location. <br /> Advanced CeoEnvironmentvl,Inc. <br />
The URL can be used to link to this page
Your browser does not support the video tag.