Laserfiche WebLink
I <br /> 03 December 2007 <br /> AGE-NC Project No. 00=0696 <br /> Page 6.of 6 <br /> 3.6. BORING ABANDONMENT <br /> I <br /> All probe borings will be permanently sealed to prevent vertical migration of potential contaminants. <br /> Soil borings shall be abandoned by backfilling with portland cement from the total depth to surface <br /> grade. <br /> b <br /> I <br /> N <br /> I <br /> Advanced Cc Envtronmcntal,Inc. <br /> I <br />