My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS_XR0012631
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
T
>
THORNTON
>
9110
>
3500 - Local Oversight Program
>
PR0545727
>
ARCHIVED REPORTS_XR0012631
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/3/2020 4:41:11 PM
Creation date
6/3/2020 4:09:24 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
3500 - Local Oversight Program
File Section
ARCHIVED REPORTS
FileName_PostFix
XR0012631
RECORD_ID
PR0545727
PE
3528
FACILITY_ID
FA0005693
FACILITY_NAME
7-ELEVEN INC. STORE #20680
STREET_NUMBER
9110
STREET_NAME
THORNTON
STREET_TYPE
Rd
City
Stockton
Zip
95209
CURRENT_STATUS
02
SITE_LOCATION
9110 Thornton Rd
P_LOCATION
01
P_DISTRICT
003
QC Status
Approved
Scanner
LSauers
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
662
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
7-Eleven/Stockton <br /> February 1989 <br /> o Sampled groundwater from monitoring wells without <br /> free product and the nearby domestic wells for V/ <br /> laboratory analyses. <br /> o Recorded the volume of product in the underground- <br /> storage tank. t <br /> o Monitored and maintained the groundwater remedies <br /> tion and soil-vent systems including sampling and <br /> analysis of the groundwater treatment system <br /> influent and effluent. <br /> ,. o Prepared installation specifications for expanding <br /> E the existing soil-vent system to include <br /> additional venting points. <br /> O Ordered and received delivery of the portable catalytic <br /> ScavengerR. <br /> ! ' o Began securing permits for the installation of <br /> additional off-site monitoring wells and the <br /> r abandonment of MW-12. <br /> i <br /> GROCINDWATER MONITORING <br /> ry� Groundwater level monitoring of the site monitoring wells <br /> was performed every two weeks following system re-start in mid- <br /> k,, November, 1988. The first monitoring was conducted on November <br /> 30. The monitoring data for the months of November through <br /> January 5, 1989 are presented in Table 1 (Appendix I) . <br /> Groundwater monitoring was conducted in accordance with GTI's <br /> Standard Operating Procedure (SOP) 8 (Appendix i2? • <br /> T'r:Gri�ur.uta,INC <br /> a.. <br />
The URL can be used to link to this page
Your browser does not support the video tag.