Laserfiche WebLink
7-Eleven/Stockton 29 <br /> November 1989 <br /> FUTURE WORK <br /> -. In addition to the continuing regularly scheduled operation <br /> and maintenance of the remediation system and monitoring and <br /> sampling of the groundwater, additional assessment and <br /> remediation-system modifications are currently being implemented. <br /> These activities include: <br /> o Expansion of the existing soil-vent system by the <br /> addition of four venting points utilizing existing <br /> monitoring wells (MW-1, MI-2, MW-3 and MW-4) and by the <br /> „p addition of an ORS Catalytic ScavengerR Vapor-Abatement <br /> System. <br /> o Additional site characterization involving the drilling <br /> of one additional monitoring well cluster located on- <br /> site downgradient of the underground storage tanks. <br /> H. o The wellhead elevation of MW-5 will be raised in order <br /> to permit access to the well during the winter months. <br /> CLOSURE <br /> Groundwater Technology, Inc. is pleased to provide Southland <br /> corporation with this project update report. If you have any <br /> - questions or need additional information regarding this site, <br /> contact our Concord office at (415) 571-2387. <br /> �`� GK�I\nt�u►�+ <br /> T'i11\IP1IKA <br /> i <br />