My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS_XR0012633
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
T
>
THORNTON
>
9110
>
3500 - Local Oversight Program
>
PR0545727
>
ARCHIVED REPORTS_XR0012633
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/3/2020 4:36:50 PM
Creation date
6/3/2020 4:14:45 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
3500 - Local Oversight Program
File Section
ARCHIVED REPORTS
FileName_PostFix
XR0012633
RECORD_ID
PR0545727
PE
3528
FACILITY_ID
FA0005693
FACILITY_NAME
7-ELEVEN INC. STORE #20680
STREET_NUMBER
9110
STREET_NAME
THORNTON
STREET_TYPE
Rd
City
Stockton
Zip
95209
CURRENT_STATUS
02
SITE_LOCATION
9110 Thornton Rd
P_LOCATION
01
P_DISTRICT
003
QC Status
Approved
Scanner
LSauers
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
441
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
_ Based on the vapor concentrations from each of the vapor extraction wells during the first <br /> " 60 hours of VES operation,the vapor extraction wells (VP-1, VP-2, VIS-3, and VP-4)were <br /> turned off fine and used as vapor inlet wells on January 8, 1989 to increase the flow of <br /> gasoline vapors to the vapor extraction wells. This isolated MW-3 on its own blower <br /> further increasing the rate of vapor extraction from this well. Since January 8, 1990 the <br /> VES has been operating on four (4) high capacity regenerative blowers on four <br /> i <br /> monitoring/recovery wells (MW-1, MW-3, MW-4, and RW-1) using VP-1,VP-2,VP-3, and <br /> VP-4 as vapor inlet wells. <br /> Kb <br /> Activated Carbon Utiliz LIgy <br /> The initial charge of 4,000 pounds of virgin 4 x 6 mesh activated carbon in reactors 1 and <br /> 4r„ <br /> x 2 were changed out and replaced with 4,000 pounds of virgin 4 x 6 mesh activated <br /> carbon on January 19, 1990. The partial saturation of the third reactor on January 19, <br /> sti 1990 did not warrant changeout since the third reactor is solely for the purpose of <br /> trapping fugitive emissions from the first two reactors. The rate of carbon utilization is <br /> t. <br /> approximately 200 pounds per day as of January 23, 1990. Thus, changeout of the <br /> _ carbon should be limited to once per month. <br /> `.. 7 <br /> VAPOR EXTRACTION TECHNOLOGY, INC. <br />
The URL can be used to link to this page
Your browser does not support the video tag.