My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SU0013407
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
T
>
12 (STATE ROUTE 12)
>
8751
>
2600 - Land Use Program
>
U-81-37
>
SU0013407
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/19/2024 3:48:19 PM
Creation date
6/4/2020 11:20:34 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2600 - Land Use Program
RECORD_ID
SU0013407
PE
2600
FACILITY_NAME
U-81-37
STREET_NUMBER
8751
Direction
E
STREET_NAME
STATE ROUTE 12
City
VICTOR
Zip
95253-
APN
05103058
ENTERED_DATE
6/3/2020 12:00:00 AM
SITE_LOCATION
8751 E HWY 12
P_LOCATION
99
P_DISTRICT
005
QC Status
Approved
Scanner
SJGOV\gmartinez
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
57
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Item No. 3 <br /> B/A 1-8-81 <br /> U-81-37 <br /> Page 3 <br /> RECOMMENDATION AND FINDINGS <br /> - Ratify the Negative Declaration. <br /> - Approval of the project subject to; <br /> 1) Obtain discharge requirements from the Regional Water Quality Control <br /> Board, Central valley Region. Provide minimum five (5) foot high <br /> perimeter fencing around the ponds with a locked gate. <br /> 2) All brine to be disposed of in the waste water settling pond shall first <br /> be oxidized in process equipment which facilitates either chemical or <br /> catalytic air oxidation of the calcium sulfite and calcium bisulfite to <br /> calcium sulfate before being transferred into the pond. An Authority to <br /> Construct approving the equipment to be installed to affect the oxidation <br /> must be obtained from the Air Pollution Control District before construc- <br /> tion of such equipment commences. As an alternative to the oxidation <br /> process, Tenneco west may process the waste brine by removing all organic <br /> matter and other contaminants and recycle the reclaimed brine, thereby <br /> eliminating the need for the pond. <br /> 3 ) A Parcel Map application to be filed to correct illegal division or lot <br /> line to be disol.ved. <br />
The URL can be used to link to this page
Your browser does not support the video tag.