Laserfiche WebLink
SJVUAPCD <br /> SJCZ <br /> Mitigation Measures <br /> page 2 <br /> 4 ) Streets adjacent to the project site should be swept as <br /> needed to remove silt which may have accumulated from <br /> construction activities . <br /> D. At all times, ozone precursor emissions should be controlled <br /> by the following methods : <br /> 1) All internal combustion engine driven equipment should be <br /> properly maintained and well tuned according to <br /> manufacturer ' s specifications . <br /> r 2 ) During the smog season (May throucrh October) , the <br /> construction period should be lengthened so as to minimize <br /> the number of vehicles and equipment operating at the same <br /> time . <br />