Laserfiche WebLink
' SOIL BOFING AND SAWFUNO VVOFtKPLAN <br /> 32 Tokay Street Lodi Calffomia <br /> 1 <br /> 3.3 Site Health and Safety Plan <br />' A site health and safety plan (SHSP) has been prepared and will be on site during all field <br /> activities A copy of the SHSP is included as Appendix B All on-site work will be <br />' conducted according to the SHSP The SHSP contains information on the properties of <br /> potentially hazardous materials determined to be on site by previous investigations The <br /> information is equivalent to that contained within Material Safety Data Sheets <br /> I3.4 Laboratory Analysis and Methods <br /> The sample analyses are scheduled to be performed by Sparger Technology, Inc , of <br /> Rancho Cordova, California, a state-certified analytical laboratory The analytical methods <br /> proposed are <br /> Soil - <br /> a) TPH, as diesel, by EPA Method 8015, and, <br /> b) BTEX by EPA Method 8020 <br /> In addition, a spike peak, surrogate sample, and standards will be run to ensure quality <br /> assurance and quality control of the analyses <br /> 3.5 Schedullno and Project Contacts <br /> The fieldwork is expected to take 1 to 2 days, and will be conducted following client and <br /> County approval of this workplan <br /> Project Contacts/Representatives <br /> Ae is Environmental Inc <br /> Paul Graff, Senior Geologist <br /> or Mark Hayes, Staff Engineer <br /> Aegis Environmental, Inc <br /> 1050 Melody Lane, Suite 160 <br /> Roseville, California 95678 <br /> (916) 782-2110 <br /> 92-074B WPN 3- <br />