My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS_XR0009197
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
T
>
TOKAY
>
32
>
3500 - Local Oversight Program
>
PR0545733
>
ARCHIVED REPORTS_XR0009197
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/15/2020 7:23:47 PM
Creation date
6/4/2020 2:44:03 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
3500 - Local Oversight Program
File Section
ARCHIVED REPORTS
FileName_PostFix
XR0009197
RECORD_ID
PR0545733
PE
3528
FACILITY_ID
FA0003901
FACILITY_NAME
PACIFIC COAST PRODUCERS (TOKAY)
STREET_NUMBER
32
Direction
E
STREET_NAME
TOKAY
STREET_TYPE
ST
City
LODI
Zip
95240
APN
04703020
CURRENT_STATUS
02
SITE_LOCATION
32 E TOKAY ST
P_LOCATION
02
P_DISTRICT
004
QC Status
Approved
Scanner
SJGOV\tmorelli
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
58
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
' SOIL BOFING AND SAWFUNO VVOFtKPLAN <br /> 32 Tokay Street Lodi Calffomia <br /> 1 <br /> 3.3 Site Health and Safety Plan <br />' A site health and safety plan (SHSP) has been prepared and will be on site during all field <br /> activities A copy of the SHSP is included as Appendix B All on-site work will be <br />' conducted according to the SHSP The SHSP contains information on the properties of <br /> potentially hazardous materials determined to be on site by previous investigations The <br /> information is equivalent to that contained within Material Safety Data Sheets <br /> I3.4 Laboratory Analysis and Methods <br /> The sample analyses are scheduled to be performed by Sparger Technology, Inc , of <br /> Rancho Cordova, California, a state-certified analytical laboratory The analytical methods <br /> proposed are <br /> Soil - <br /> a) TPH, as diesel, by EPA Method 8015, and, <br /> b) BTEX by EPA Method 8020 <br /> In addition, a spike peak, surrogate sample, and standards will be run to ensure quality <br /> assurance and quality control of the analyses <br /> 3.5 Schedullno and Project Contacts <br /> The fieldwork is expected to take 1 to 2 days, and will be conducted following client and <br /> County approval of this workplan <br /> Project Contacts/Representatives <br /> Ae is Environmental Inc <br /> Paul Graff, Senior Geologist <br /> or Mark Hayes, Staff Engineer <br /> Aegis Environmental, Inc <br /> 1050 Melody Lane, Suite 160 <br /> Roseville, California 95678 <br /> (916) 782-2110 <br /> 92-074B WPN 3- <br />
The URL can be used to link to this page
Your browser does not support the video tag.