Laserfiche WebLink
I <br /> 01 <br /> IIf <br /> USTCF WORK SUMMARY <br /> REIMBURSEMENT REQUEST NO.5 <br /> Former CURTISS PONTIAC <br /> 2450 Toste Road,Tracy,California <br /> f .. <br /> i <br /> r <br />'r <br /> lnvoice.No. M 3:. Laboratbry analysis:as part of the quarterly ground water monatonng at;the <br /> site: <br /> Invoice No, 6912: Preparation of a Remedial Action Work Plan..AddendumY,as requested by <br /> the San Jorâ–ºquin County Environmental Health Department(SJCEITD) <br /> Invoice No. 7051. Preparation of a Quarterly Report for the fourth quarter o f 2002.. <br /> Invoice No.6999: Performance of field work and laboratoryanalysis for first quarter 2003 <br /> ground water monitoring event. <br /> Invoice.No. 7247: Preparation of a Quarterly Report for the first quarter of w. <br /> Tn:voic+ :N .11$8.: Abandonment ofmonitoring wells MW-1A,MW. --1B,MW- , and-MW-J,- <br /> as <br /> nd MW-7;as part ofthe proposed remediation plan, approved by the SJCEHD.. <br /> Invoice No. 7429.: Remediation:s6il excavation and sampling,as approved rti overseen..by <br /> `the:SJCEHD(details.attached page) <br /> Invoice Ido. 7430: Disposal of contaminated soil as part of remediation plan,appro; by the <br /> 5=1413(see attached page). <br /> Invoice No. 743;1: Backfilling and compaction of the excavation,,as partfi.the rerrxediation <br /> plan(see attached page). <br /> invoice Net. 74.78: R:e=installation ofmonitoring wells MW4A,MW-1B,MSV 4 and MW-7; <br /> directed and approved by the SJCEHD. <br /> Invoice No. 03-152: Resurfacing of asphalt removed and destroyed as part of the remediation <br /> plan and excavation. (Wilson.Construction):; <br /> Invoice No. 03-147: Grading and finishing-eXcavat on,prior to resurfacing;(tncluding <br /> additianatbackfill material to raise to 4-inches below de :i <br /> l <br />