My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SITE INFORMATION AND CORRESPONDENCE
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
T
>
TOSTE
>
2450
>
3500 - Local Oversight Program
>
PR0545734
>
SITE INFORMATION AND CORRESPONDENCE
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/5/2020 2:04:10 PM
Creation date
6/4/2020 2:53:39 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
3500 - Local Oversight Program
File Section
SITE INFORMATION AND CORRESPONDENCE
RECORD_ID
PR0545734
PE
3528
FACILITY_ID
FA0010191
FACILITY_NAME
TRACY-PONTIAC-CADILLAC-GMC TRUCK
STREET_NUMBER
2450
STREET_NAME
TOSTE
STREET_TYPE
RD
City
TRACY
Zip
95376
APN
238020-06
CURRENT_STATUS
02
SITE_LOCATION
2450 TOSTE RD
P_DISTRICT
005
QC Status
Approved
Scanner
LSauers
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
402
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
SUMMARY OF REMEDIATION(OVEREXCAVATION)ACTIVrrIES <br /> 27 MAY 2003 - The asphalt overlaying the area to be excavated was saw cut, removed and <br /> stockpiled.Overexcavation began with approximately 100 cubic yards.ofhydrocarbon-impacted sail <br /> excavated and stockpiled; <br /> 2$M02003-Overexcavation continued;approximately 500 cubic yards ofhydrocarbon-impacted <br /> soil was:excavated and stockpiled. Unmarked sprinkler line damaged and temporarily repaired. <br /> Damaged asphalt noted in stockpile area and area leading to and from.excavation:. <br /> 291V 2003-Overexcavation continued-approximately 5OO cubic yards ofhydrocarbon impacted <br /> soil was excavated and stockpiled. Re-engineering of a canopy attached to the showroom and <br /> removal of former dispenser island,vent lines and concrete drive required,additional;subcontractor <br /> costs and delayed excavation..The dispenser island area was not originally proposed for°excavation <br /> due to the load bearing nature of the canopy support. Because of the highly-impacted soil located <br /> below the f6rm dispenser islands,the property owner and EHD approved removal ofthe structure <br /> to facilitate excavation. <br /> 30 MAY 2003-Continuation of overexcavaaon.Field indications s uggested sl illow soil.(I ss than <br /> 3 feet below grade)'would not require offsite dispersal.A separate stockpile was established for clean <br /> overburden.Approxi>tirtateiy 300duhic yards ofhydrocarbon-impacted soil excavated and stockpired <br /> appmxirnately 140 cubic yards of clean overburden stockpiled. <br /> 02 and 03 JUNE.2003 Backfilling of excavation. During backfilling on 03 rune 2003;. sub- <br /> contractor damaged wwater supply line..Additional time required.,to repair line. <br /> 04 JUNE:1003 - Loading and transportation of excavated soil. Soil was transported to Forward. <br /> Landfill.Additional damage to asphalt parking;lot caused by loading and transportation activities <br /> was=noted:: . <br /> O5 JUNE 2003-C nuation.of loading and transportation of excavated sail.and;permanent repair <br /> of broken water supply lines. Based,on weight tags received from the landfill,approximately 1,350 <br /> tons of impacted soil was removed from the site. <br /> 06;09`through 12 JUNE 2003-Asphalt damaged during stockpiil>ti g,loading and transporting was. <br /> stockpiled and removed from the site.Additional backfilling;rough grading and clean-up completed. <br /> for asphalt replacement(Wilson Construction subsequently camoJti and performed"final"grading <br /> and replaccnjent ofasphalt);. <br />