Laserfiche WebLink
A f E <br /> t <br /> i <br /> I <br /> page 2,2450 Taste Read <br /> i <br /> i <br /> fi0ld-screened and segregatedinto dean and dirty stockpiles. The <br /> contaminated soil will be sampled and analyzed for profiling prior to removal <br /> to an appropriate disposal facility. Soil samples for analysis will be collected 3 <br /> from the sides and the bottom of the excavation. Following the:coilect!on of <br /> samples,the excavation will be filled with clean soil and/or road base. t <br /> 3; Groundwater and saturated sail encountered during the over excavation will <br /> be handled as previously discussed. <br /> 4: Following the completion of site surface restoration the destroyed monitoring <br /> wells w!!I be.reinstalled. Natural attenuation parameters>vvill b0t.nonitored <br /> dUrino roUtine:quartarly:groundwater monitoring and sampling events.. <br /> Routine quarterly groundwater monitoring and sampling events must continue <br /> At this site until directed otherwise by this department.. <br /> Please proceed with submittal of a San Joaquin County Well Destruction Permit and the. <br /> required $60.00 permit fee, a San Josquin County Well Installation Permit and the <br /> required $89.00 perrnitfee,and with scheduling all fieldwork. As you had previously ' <br /> agreed that this over-excavation would be completed !n October 2042, SJC/EHD <br /> expeots work to commence immediately; <br /> If you have.any questions.please cell tori Duncan at(209)468-0837. ; <br /> [Janna Heran, REHS Director <br /> Environmental Health Department. ' <br /> Lori Duncan, Senior REBS Nuel C. Henderson,Jr., RG <br /> J. <br /> LOP/Site Mitigation Unit IV LOP/Site Mitigation Unit IV <br /> l <br /> James L.L. Barton, GVI-WQCB <br /> Paul Dotson, AGE <br /> ' 1 <br /> . r i <br /> 1 <br /> •' 1 <br /> d <br /> f <br />