My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SITE INFORMATION AND CORRESPONDENCE
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
T
>
TOSTE
>
2450
>
3500 - Local Oversight Program
>
PR0545734
>
SITE INFORMATION AND CORRESPONDENCE
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/5/2020 2:04:10 PM
Creation date
6/4/2020 2:53:39 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
3500 - Local Oversight Program
File Section
SITE INFORMATION AND CORRESPONDENCE
RECORD_ID
PR0545734
PE
3528
FACILITY_ID
FA0010191
FACILITY_NAME
TRACY-PONTIAC-CADILLAC-GMC TRUCK
STREET_NUMBER
2450
STREET_NAME
TOSTE
STREET_TYPE
RD
City
TRACY
Zip
95376
APN
238020-06
CURRENT_STATUS
02
SITE_LOCATION
2450 TOSTE RD
P_DISTRICT
005
QC Status
Approved
Scanner
LSauers
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
402
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
page 2 <br /> 2450 Toste Road, Tracy <br /> In August 200 a limited aquifer pumping test was performed at the site. The pumping <br /> rate for the test was 1.0 gallons per minute. Reported results from the test were that a <br /> maximum drawdown of 2.89 feet was observed in shallow groundwater monitoring well <br /> MW-1 B, the pumping well, and 0.15 feet in deeper groundwater monitoring well MW 1A. ; <br /> A radius of influence was not determined from the test because there was no drawdown >i <br /> measured in the surrounding observation wells: However, these observation wells are <br /> located approximately 60-70 feet from MW-1 B. <br /> PHSIEHD does not approve the submitted work pian addendum. You are directed to <br /> complete your feasibility studies and prepare a Corrective Action.Plan (CAP)foryour <br /> site. Subrnit a work pian for'further=feasibility testing to PHSIEHD by October 29, 2001. <br /> Confirmation of the source of the::co.o. tamination detected in CPT-;2.may be included;.but: <br /> the eoope of work must not,be excessive. <br /> If you have any questions or comments please call Lori Duncan at (209)468-0337. <br /> Gonna Herin, REHS Director <br /> Envirorimentel Health Division <br /> Lori Duncan,.Senior REHS Dot Lofstrom R.G. <br /> LOP/Site Mitigation Unit IV: Engineering Geologist <br /> j. <br /> cc. Marty Hartzell;CVRWOCB <br /> Brian Millman,AGE r <br /> t <br />
The URL can be used to link to this page
Your browser does not support the video tag.