Advanced GeoEnvironmental, Inc. <br /> November 17, 1999 <br /> On November 10, 1999,PHS/EHD was additionally informed that MW-7,the <br /> northernmost MW in the work plan would not be completed until the analytical <br /> results of the soil samples from the other monitoring wells were reviewed and it was <br /> determined that MW-7 was still necessary. PHS/EHD was not consulted before these <br /> decisions were made. <br /> At the meeting on November 16, 1999, PHS/EHD was informed that AGE planned to <br /> install another MW not proposed in the work plan next to MW-6, which was installed <br /> in the continuous cored bore-hole. As part of the work plan approval,PHS/EHD <br /> provide the condition that the proposed boring (continuous core boring) near B5 <br /> should advance to at least 30,feet below surface grade with the contingency to bore <br /> deeper if necessary to provide vertkA.definition and that if>it was necessary a MW be <br /> installed in separate boring. Installation of a second separate.MW next,to MW-6 <br /> deviates from this condition. <br /> Communication about site corrective action decisions and the scheduling of work <br /> between PHS/EHI) and AGE must improve. PHS/EHD approval should be obtained <br /> .before any modifications to the work plan are made. Notification to,PHS/EHD of <br /> scheduled work should be,Made,when AGE has every indication:that the work will. <br /> ,commence on the.propose&date. . <br /> If you have any questions please co Jeffrey Wong av'(209 <br /> contact T <br /> .. 468-03,35. <br /> Donna Heran, REHS,.Director: <br /> Environmental Health Division A <br /> 4 <br /> X. <br /> Jeffrey Wong,REHS Margaret> agorlo, REHS <br /> on <br /> . :Unit TV Supervisor <br /> CC PHS/El-ID-:Lori Duncan <br />