My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WORK PLANS
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
T
>
TOSTE
>
2450
>
3500 - Local Oversight Program
>
PR0545734
>
WORK PLANS
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/5/2020 1:20:26 PM
Creation date
6/4/2020 2:57:35 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
3500 - Local Oversight Program
File Section
WORK PLANS
RECORD_ID
PR0545734
PE
3528
FACILITY_ID
FA0010191
FACILITY_NAME
TRACY-PONTIAC-CADILLAC-GMC TRUCK
STREET_NUMBER
2450
STREET_NAME
TOSTE
STREET_TYPE
RD
City
TRACY
Zip
95376
APN
238020-06
CURRENT_STATUS
02
SITE_LOCATION
2450 TOSTE RD
P_DISTRICT
005
QC Status
Approved
Scanner
LSauers
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
176
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
15 May 2008 <br /> AGE-NC Project No. 96-0254 <br /> Page 2 of 2 <br /> One soil boring(OZ-1) will be advanced on-site for the purpose of soil sample collection for an <br /> ozone bench scale test. Soil samples selected for analyses will be collected from the saturated zone, <br /> approximately the 15 and-3-5 foot-interval-below=surface^-grade:It is proposed that up to twelve <br /> soil samples will be selected for analyses:Soilsamples from each interval will be utilized for the <br /> Ozone Injection Bench Scale Study. Procedures for the advancement of the soil boring and for soil <br /> sampling are attached in Appendix B. <br /> Ground water samples representative of the dissolved hydrocarbon plume will be collected in <br /> accordance with sampling procedures described in previous quarterly monitoring reports, and in <br /> compliance with the Central Valley Regional Water Quality Control Board(C VRWQCB)guidelines <br /> for sampling.Ground water samples from MW-1B and MW-4 monitoring wells will be used for the <br /> ozone injection bench scale test. Ground water sampling procedures are attached in Appendix B. <br /> Adequate ground water samples will be collected for analysis also to include the general mineral <br /> parameters, and for utilization during the proposed Ozone Injection Bench Scale Study. The <br /> shipment of the samples to a laboratory for analysis will occur within 24 hours of sampling. <br /> Procedures for the Ozone Injection Bench Scale Study are attached in Appendix C. i <br /> A geochemical evaluation(GE)of the Ozone Injection Bench Scale Study will be prepared by the <br /> analytical laboratory; it will present the results of tests for the formation of by-products and the <br /> potential for contaminant reduction,with generalized worst case reactions. The report will be in a <br /> format acceptable to the CVRWQCB,and will be reviewed by a California Professional Geologist. <br /> Upon completion of the proposed scope of work,a report of findings will be prepared and submitted <br /> to the EHD for consideration of permanent ozone injection system operation and monitoring. <br /> Upon approval of the work plan, AGE will submit a drilling permit and application fee to the <br /> appropriate agency. If you have any questions or require further information, please contact our <br /> office at(209)467-1006. <br /> i <br /> Sincerely, <br /> Advanced GeoEnvironmental, Inc. <br /> .. ., rr <br /> MR <br /> 1W 1*11 <br /> 1'4 <br /> r viam i le <br /> Nu <br /> Staff Geologist Senior Project Geologist a <br /> s <br /> California Professional Geo t 73 <br /> I <br /> I <br />
The URL can be used to link to this page
Your browser does not support the video tag.