My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WORK PLANS
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
T
>
TOSTE
>
2450
>
3500 - Local Oversight Program
>
PR0545734
>
WORK PLANS
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/5/2020 1:20:26 PM
Creation date
6/4/2020 2:57:35 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
3500 - Local Oversight Program
File Section
WORK PLANS
RECORD_ID
PR0545734
PE
3528
FACILITY_ID
FA0010191
FACILITY_NAME
TRACY-PONTIAC-CADILLAC-GMC TRUCK
STREET_NUMBER
2450
STREET_NAME
TOSTE
STREET_TYPE
RD
City
TRACY
Zip
95376
APN
238020-06
CURRENT_STATUS
02
SITE_LOCATION
2450 TOSTE RD
P_DISTRICT
005
QC Status
Approved
Scanner
LSauers
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
176
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Advanced <br /> ' GeoEnvironmental, Inc . <br /> 15 May 2008 <br /> AGE-NC Project No. 96-0254 <br /> R C�N L <br /> C� <br /> Ms. Lori Duncan <br /> San Joaquin County Environmental Health Department MAY 1 5 2008 <br /> 600 East Main Street <br /> Stockton, CA 95202 ENVIRON v1EN 1 HEALTH <br /> PERI 9l I/SERVICES <br /> Subject: Ozone Injection Bench Scale Work Plan r <br /> CURTISS PONTIAC-CADILLAC <br /> 2450 Toste Road, Tracy, California <br /> k <br /> Dear Ms. Duncan: <br /> t <br /> At the request of Mr. Joe Toste, Jr. Advanced GeoEnviromnental, Inc. (AGE) has prepared the <br /> feasibility work plan for assessment ozone injection near the former underground storage tank(UST) <br /> release area at the Curtiss Pontiac-Cadillac site located at 2450 Toste Road,Tracy,California. The <br /> work plan-details an Ozone Injection Bench Scale Test. Site historical background information is <br /> attached in Appendix A. This workplan was prepared at the request of the San Joaquin County <br /> Environmental Health Department (EHD), by letter dated18 March 2008. ({ <br /> The scope of work will consist of the following tasks: <br /> { <br /> • Permitting,planning, and pre-field work activities; <br /> • Drilling and soil sampling of a soil boring; <br /> Laboratory analysis of soil and groundwater samples; i <br /> • Performance of a laboratory ozone injection bench scale test; and <br /> • Preparation of a report.: <br /> Applicable site permits (i.e. drilling/well installation permits) will be obtained from the EHD.In <br /> addition,an update to the health and safety plan presently on-file will be prepared in accordance with <br /> the Occupational Safety and Health Guidance Manual for Hazardous Waste Site Activities(National <br /> Institute for Occupational Safety and Health Administration, U.S. Coast Guard and U.S. <br /> Environmental Protection Agency, 1985).Prior to mobilization,all underground trenching areas will <br /> be clearly marked, and a utility clearance obtained through Underground Service Alert. <br /> 837 Shaw Road, Stockton, California 95215 <br /> Telephone(209)467-1006 Fax(209)467-1118 <br />
The URL can be used to link to this page
Your browser does not support the video tag.