Laserfiche WebLink
Tank Assessment Page Tank Name: Pre Neutralizer Wank No 2 <br />Tank ages: Purchased new in 2016. <br />Remaining service lite: Estimated 20 years. <br />Tank Construction: <br />Shape: Cylindrical, flat bottom, open top. <br />Orientation: Vertical. <br />Location: Above Ground- <br />Material <br />roundMaterial of Construction: [ligh Density Crosslinked Polyethylene <br />Thickness: 0.243" measured 6" below the top of tank wall using an ultrasonic <br />gage. <br />Lining material and thickness: NA <br />Corrosion protection equipment: NA <br />Structural support: Steel support stand. <br />Other identifying features: Seamless, One Piece Construction, Natural, <br />rotationally molded. <br />Equipped with level control to prevent overflow. <br />Piping and ancillary equipment (pumps): <br />Piping Material of Construction: Poly Vinyl Chloride (PVA;). <br />Piping Diameter: 3 in. <br />Putrtp location: after secondary neutralizer tank. <br />Pump type./capacity: centrifugal pump - 40 gptn <br />Material Storage: <br />Materials and characteristics: Wastewater with pH between 2 and 12. <br />Specific Gravity: approx. 1 <br />Operating Capacity: 370 gallons. <br />Chemical compatibility findings: The materials identified above: are compatible for <br />contact with or proximity to the equipment, tank or tank system in this assessment. <br />Initials: 411 � <br />Visual 'Inspection: <br />`lank parameters at time of inspection: three in use. <br />Acute visual evidence of leaks: none. <br />Condition of interior surface: good_ <br />Condition of exterior surface: good. <br />Condition of nozzles, flanges, fittings at tank: good. <br />Condition of piping: good. <br />Visual .Inspection findings: A visual inspection of the tank and its affiliated pumps, <br />piping and ancillary equipment did not reveal signs of leaks, corrosion, weld cracks or <br />breaks, or scrapes in protective coating which may cause a release from the tank system. <br />A description of all discrepancies noted during the visual inspection �s included with this <br />report. Initials: <br />:r <br />California Tank Lines, Inc. Wastewater Processing Tanks (3) <br />