My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2020
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
E
>
EL DORADO
>
3105
>
2231-2238 – Tiered Permitting Program
>
PR0506982
>
COMPLIANCE INFO_2020
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/15/2021 11:16:58 AM
Creation date
6/5/2020 2:18:00 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2231-2238 – Tiered Permitting Program
File Section
COMPLIANCE INFO
FileName_PostFix
2020
RECORD_ID
PR0506982
PE
2231
FACILITY_ID
FA0003680
FACILITY_NAME
CALIFORNIA TANK LINES INC
STREET_NUMBER
3105
Direction
S
STREET_NAME
EL DORADO
STREET_TYPE
ST
City
STOCKTON
Zip
95206
APN
17512028
CURRENT_STATUS
01
SITE_LOCATION
3105 S EL DORADO ST
P_LOCATION
99
P_DISTRICT
001
QC Status
Approved
Scanner
SJGOV\gmartinez
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
209
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
-Scco Khrt',onmit nt Assessment Page .A: <br />Overhead vicew <br />p�a� aat� neva <br />Cross soctwrml (lateral) view. <br />lit <br />/"L� •m <br />Volume catcu%tioars: <br />'T'ank volurne (largest tank): 7,400 gallons. <br />Containment volume (sum of areas 1, 2 8t 3) = 14,363 gallons (gross) <br />Less tank volume = 376 gallons, containment volume = 13,937 gallons (net) <br />VolumeAnclr = 13987 pU24 in = 582.8 gaLU <br />Excess volume = 13987 - 7400 gals. equivalent to 6587 gal 1582.8 gal/in - 11.3 in <br />24 hr., 25 yr. storm = 2.4 to 2.6' for most of San Joaquin Valley_ <br />Therefore, secondary containment volume is adequate. <br />Design of € ontainment area: Secondary containment is provided by a nurrii t -.r of areas enclosed by poured <br />concrete, or iaoncrete block walls with mbar. The containment area does not have cracks or gaps to allow the <br />escape of spilled material. Arm 1 (East encs) is connected to area 2 by an open 6 in. pipe, and area 2 is <br />connected to area 3 (West end) by a 6 in- pipe. These pipes will accommodate flow of 300 to 500 gpm <br />depending upon the bead. Area 1 is equipped with a level indicator for leak detection, which will sound an <br />alarm when liquid is detected. Liquid is recycled using an AODD pump_ <br />Areas 1, 2 & 3 are coated with epoxy which is re-applied annually. <br />Secondary Containment Leak Tests — The pre -neutralizer area (Ards 1, 2 6. 3). and the final neutralizer area, <br />are filtcxl with water (area 3 partially filled, area 1 -- remove pumps before fil ling), and visually checked for <br />leaks. Upon completion, the water is treated in the system and discharged to the sewer. Testing Will be in Mated <br />this year or eardy next and repeated every five years. ApfxopriatP, records. %.611 be maintained. <br />Site Security_ The entire site is few. The gate is locked when company personnel are not present. <br />Secondary Containment fmdi[W: The secondary containment, system is ot'sufticient capcity and condition <br />for the cottWnMCut of rr;leases from the 7,400 gallon wastewater tank and ancillary equipment^ <br />Tnifials: <br />California Tank Lines, Inc. Wastewater Processing 'Tanks (3) <br />
The URL can be used to link to this page
Your browser does not support the video tag.