Site Survey <br /> After the well installations are complete, all of the monitoring wells associated with this site <br /> will be surveyed to a common datum The surveying will be conducted by a Professional <br /> land surveyor under the direction of BC <br /> PROJECT SCHEDULE <br /> The fieldwork will require approximately two days to complete The fieldwork will be <br /> initiated upon County approval of the work plan and well installation permits and on obtaining <br /> off site property access <br /> A draft summary report in letter Corm will be completed within approximately five weeks after <br /> the laboratory reports are received The summary report will include a description of field <br /> methods and conclusions The draft summary report will be submitted to ARCO for review <br /> and comment Upon approval by ARCO, the summary report will be finalized and submitted <br /> to the County and the Regional Board <br /> i <br /> i <br />. Use or disclosure of data contained on this sheet is subject to the restriction specified at the beginning of this <br /> document <br /> 26404ZEPORTS\264MI WP <br />