Laserfiche WebLink
59 Site Health and Safety Pian <br /> A site-specific Health and Safety Plan is included in Appendix A The plan describes <br /> the basic safety requirements for work at the Site It is applicable to both personnel of <br /> Roux and to subcontractors of Roux. The Roux field geologist will be the safety officer <br /> on-site Personnel at the Site will be briefed on the contents of the Site Health and <br /> Safety Plan before work begins. A copy of the plan will be kept at the work site and <br /> will be available for reference by appropriate parties during the work <br /> 6.0 REPORT PREPARATION <br /> A report will be prepared which summarizes data gathered during tank replacement <br /> activities The report will contain a description of field methods, laboratory procedures, <br /> laboratory reports and Chain-of-Custody documents The report will also contain maps <br /> to illustrate sample locations and the extent of petroleum hydrocarbons at the Site A <br /> draft report will be prepared for ARCO's review and comments, prior to being finalized <br /> for submittal to the PHS-EHD and the Regional Water Quality Control Board (RWQCB) <br /> 8 Doc #A159W0115 <br />