Laserfiche WebLink
' TABLE OF CONTENTS <br /> Section Page No <br /> EXECUTIVE SUMMARY ES-1 <br /> 1 0 INTRODUCTION 1 <br /> ' 20 PREVIOUS INVESTIGATIONS AND REMEDIATION ACTIVITIES 1 <br /> ' 30 HYDROGEOLOGIC SETTING 2 <br /> 40 SITE DEMOLITION AND REMEDIATION 3 <br /> 41 Removal and Over-excavation of the USTs 3 <br /> 42 Removal of the Product Lines 5 <br /> 43 Removal and Over-excavation of the Pump Islands 5 <br /> 44 Removal of the Septic Tank 6 <br /> 45 Removal of the Service Bay Hoists 6 <br /> 46 Location and Status of Former Water Supply Well 7 <br /> ' 47 Excavated Soil Stockpiles 7 <br /> 50 INSTALLATION OF WELL MW-3A 7 <br /> 60 CONCLUSIONS 8 <br /> 7 0 RECOMMENDATIONS 8 <br /> 80 LIMITATIONS 9 <br />' FIGURES <br />' FIGURE 1 LOCATION MAP <br /> FIGURE 2 PREDEMOLITION SITE PLAN <br /> FIGURE 3 SOIL SAMPLE LOCATION MAP <br /> TABLES <br />' TABLE 1 SUMMARY OF GROUNDWATER ANALYTICAL RESULTS <br /> TABLE 2 SUMMARY OF ANALYTICAL RESULTS FOR SOIL SAMPLES <br />' APPENDICES <br /> APPENDIX A PRELIMINARY INVESTIGATION AND EVALUATION REPORT <br />' DATED JANUARY 31 , 1992 <br /> APPENDIX B MONITORING WELL MW-3A INSTALLATION REPORT <br /> DATED DECEMBER 3, 1993 <br />' APPENDIX C LABORATORY ANALYTICAL REPORTS <br /> 41itteftuser <br /> C 0 R P O R A ! t O N <br /> P2188R008 wp403194► <br />