My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS_XR0007659
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
T
>
TRACY
>
3788
>
3500 - Local Oversight Program
>
PR0545739
>
ARCHIVED REPORTS_XR0007659
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/8/2020 12:24:29 PM
Creation date
6/8/2020 12:18:22 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
3500 - Local Oversight Program
File Section
ARCHIVED REPORTS
FileName_PostFix
XR0007659
RECORD_ID
PR0545739
PE
3528
FACILITY_ID
FA0006002
FACILITY_NAME
UNION OIL #6348
STREET_NUMBER
3788
Direction
N
STREET_NAME
TRACY
STREET_TYPE
BLVD
City
TRACY
Zip
95376
APN
21225002
CURRENT_STATUS
02
SITE_LOCATION
3788 N TRACY BLVD
P_LOCATION
03
P_DISTRICT
005
QC Status
Approved
Scanner
LSauers
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
4
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Mr Edward C Ralston November 10, 1993 <br /> Page Number 2 <br /> well will be completed to a depth between 20 and 25 feet below the ground surface <br /> Each well will be completed with 15 feet of 0 02 inch slotted casing <br /> The well screen will be surrounded by a sand filter pack that will extend one foot <br /> above the screen interval One foot of bentonite will be placed above the sand The <br /> remainder of the annular space around the well casing will be filled to the surface with <br /> neat cement The wellhead will be enclosed in a locking, flush-mounted, traffic-rated <br /> well box Soils generated from the drilling activity will be stockpiled onsite on <br /> visqueen pending laboratory analysis for disposal <br /> The well will be developed using a bailer, surge block, or pump at least 72 hours after <br /> the time of installation Development water will be temporarily stored onsite a 55- <br /> gallon DOT-approved drum for subsequent analysis and disposal In addition, <br /> Mittelhauser will survey the elevation of the top of the well relative to the three other <br /> wells at the site which have already been surveyed to a common datum Following <br /> the well installation, development, and surveying, groundwater samples will be <br /> obtained from the well for laboratory analysis during the regular quarterly monitoring <br /> program at the site <br />*d The field work will begin as soon as Mittelhauser obtains a permit for the well from <br /> the San Joaquin County Public Health Services, and schedules a driller with a C-57 <br /> license for the drilling and well installation It is anticipated that the well installation <br /> will be completed in 1 day A brief well installation report, which will contain a boring <br /> log and well construction diagram, will be submitted approximately 2 weeks after <br /> completion of the field work <br /> If you have any questions or comments regarding the proposed work, please give us <br /> a call at (510) 416-2902 <br /> Sincerely, <br /> MITTELHAUSER CORPORATION <br /> Steven W Pierce Da id J Blunt <br /> Senior Hydrogeologist Geoscience Manager, RG #4516 <br /> SWP DJBI <br /> P216BLO27 WP <br /> Attachment Figure 1 , Site Location Map <br /> Figure 2, Site Plan <br /> cc Mr Harlin Knoll, San Joaquin County Public Health Services <br />
The URL can be used to link to this page
Your browser does not support the video tag.