My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS_XR0007660
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
T
>
TRACY
>
3788
>
3500 - Local Oversight Program
>
PR0545739
>
ARCHIVED REPORTS_XR0007660
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/8/2020 12:28:04 PM
Creation date
6/8/2020 12:18:30 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
3500 - Local Oversight Program
File Section
ARCHIVED REPORTS
FileName_PostFix
XR0007660
RECORD_ID
PR0545739
PE
3528
FACILITY_ID
FA0006002
FACILITY_NAME
UNION OIL #6348
STREET_NUMBER
3788
Direction
N
STREET_NAME
TRACY
STREET_TYPE
BLVD
City
TRACY
Zip
95376
APN
21225002
CURRENT_STATUS
02
SITE_LOCATION
3788 N TRACY BLVD
P_LOCATION
03
P_DISTRICT
005
QC Status
Approved
Scanner
LSauers
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
40
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
I <br /> Final Remedial Plan 9 September 1992 <br /> 3788 Tracy Boulevard Rev. : D1 <br />' Tracy, California P1745R005.WP <br /> Day 11 Hiatus for analysis of pit sidewall and pipe-trench <br />' floor samples. <br /> (Additional excavation and sample analysis if <br />' necessary, 3 days. ) <br /> Backfill with clean soil, compact. <br />' Day 19 Replacement of one groundwater monitoring well <br /> abandoned prior to excavation. <br />' Day 31 Receive analytical results, coordinate soil removal. <br /> Following installation and development of the new <br />' groundwater monitoring well, all wells will be monitored and <br /> sampled quarterly. <br />' At the end of one year of monitoring (approximately fall <br /> of 1993) , data will be evaluated with respect to the quality of the <br /> groundwater underlying the site. Should no contamination have been <br /> found during this period, project closure will be requested of the <br />' appropriate regulatory agencies. <br /> I <br /> SCHEDULED PERSONNEL AND EQUIPMENT <br />' A. Personnel <br /> IDemolition of structures, removal of paving and debris, <br /> . lremoval of underground storage tanks, and over-excavation of tank <br /> Ipits to remove contaminated soil will be performed by Gettler-Ryan, <br /> Incorporated, of Hayward, California, a general contractor. <br /> IGettler-Ryan has more than 30 years experience in all phases of <br /> site construction and demolition. Gettler-Ryan holds State <br /> Contractor's license #220793 with Class B, C-61, D-40, C-57 and Haz <br /> A attachments. All personnel present on site will have received <br /> I40-hour SARA hazardous site health and safety training. <br /> I <br />
The URL can be used to link to this page
Your browser does not support the video tag.