I <br /> Final Remedial Plan 9 September 1992 <br /> 3788 Tracy Boulevard Rev. : D1 <br />' Tracy, California P1745R005.WP <br /> Day 11 Hiatus for analysis of pit sidewall and pipe-trench <br />' floor samples. <br /> (Additional excavation and sample analysis if <br />' necessary, 3 days. ) <br /> Backfill with clean soil, compact. <br />' Day 19 Replacement of one groundwater monitoring well <br /> abandoned prior to excavation. <br />' Day 31 Receive analytical results, coordinate soil removal. <br /> Following installation and development of the new <br />' groundwater monitoring well, all wells will be monitored and <br /> sampled quarterly. <br />' At the end of one year of monitoring (approximately fall <br /> of 1993) , data will be evaluated with respect to the quality of the <br /> groundwater underlying the site. Should no contamination have been <br /> found during this period, project closure will be requested of the <br />' appropriate regulatory agencies. <br /> I <br /> SCHEDULED PERSONNEL AND EQUIPMENT <br />' A. Personnel <br /> IDemolition of structures, removal of paving and debris, <br /> . lremoval of underground storage tanks, and over-excavation of tank <br /> Ipits to remove contaminated soil will be performed by Gettler-Ryan, <br /> Incorporated, of Hayward, California, a general contractor. <br /> IGettler-Ryan has more than 30 years experience in all phases of <br /> site construction and demolition. Gettler-Ryan holds State <br /> Contractor's license #220793 with Class B, C-61, D-40, C-57 and Haz <br /> A attachments. All personnel present on site will have received <br /> I40-hour SARA hazardous site health and safety training. <br /> I <br />