My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS_XR0007660
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
T
>
TRACY
>
3788
>
3500 - Local Oversight Program
>
PR0545739
>
ARCHIVED REPORTS_XR0007660
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/8/2020 12:28:04 PM
Creation date
6/8/2020 12:18:30 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
3500 - Local Oversight Program
File Section
ARCHIVED REPORTS
FileName_PostFix
XR0007660
RECORD_ID
PR0545739
PE
3528
FACILITY_ID
FA0006002
FACILITY_NAME
UNION OIL #6348
STREET_NUMBER
3788
Direction
N
STREET_NAME
TRACY
STREET_TYPE
BLVD
City
TRACY
Zip
95376
APN
21225002
CURRENT_STATUS
02
SITE_LOCATION
3788 N TRACY BLVD
P_LOCATION
03
P_DISTRICT
005
QC Status
Approved
Scanner
LSauers
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
40
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
I <br /> Final Remedial Plan 10 September 1992 <br /> 3788 Tracy Boulevard Rev. : D1 <br />' Tracy, California P1745R005.WP <br /> Project oversight, permitting, soil and water sampling, <br /> Iand reporting will be performed by Mittelhauser Corporation of <br /> Pleasanton, California. Mittelhauser is an environmental <br />' consultant with 18 years in the environmental field. The project <br /> will be managed by a California Registered Geologist. All <br />' Mittelhauser personnel present on site will have received 40--hour <br /> SARA hazardous site health and safety training. <br /> 1 Installation of a groundwater monitoring well to replace <br /> MW-31 demolished during excavation, will be done by West HazMat <br /> Drillers of Hayward, California, C-57 license #554979 . All <br /> personnel present on site will have received 20-hour or 40-hour <br /> ISARA hazardous site health and safety training. <br /> A Site Safety Meeting will be held each day before work <br /> commences, in which the work of the day, potential health and <br /> safety hazards, and emergency procedures will be discussed. <br /> I <br /> B. Equipment <br /> Demolition of structures will be accomplished with a <br /> ICaterpillar D-9 with 5-yard bucket and ripping teeth in back. <br /> Debris will be removed by 20-yard end-dump trucks. Excavation <br /> I will be done with a Komatsu 300 power shovel. 20-yard end-dump <br /> trucks will bring in clean gravel and soil for backfilling the <br /> pits. A vibratory compactor will compact soil to required <br /> Istandards. <br />' The replacement monitoring well will be installed using <br /> a Mobile B-57 drill rig with 8" hollow-stem auger. A 2" diameter <br /> well will be constructed of Schedule 40 PVC which is slotted from <br /> 10 feet below to five feet above the water table. The PVC will be <br /> surrounded by sand pack to one foot above the screened interval, <br />
The URL can be used to link to this page
Your browser does not support the video tag.