I <br />' Final Remedial Plan 11 September 1992 <br /> 3788 Tracy Boulevard Rev. : D1 <br />' Tracy, California P1745R005.WP <br /> one foot of bentonite, and grouted to the surface with neat cement. <br />' The well head will be enclosed in a locking, flush-mounted, <br /> traffic-rated box. <br /> I <br />' COMPLETION OF PROJECT <br />' Following backfilling and compaction of the soil to a <br /> level surface and then installation and development of the <br /> replacement groundwater monitoring well, the four onsite monitoring <br /> Iwells will be monitored and sampled for a period of one year. <br /> Water samples obtained will be analyzed for TPH-G, BTEX, and TOG. <br /> Following one year of groundwater monitoring, data <br /> obtained will be evaluated to determine the appropriate ongoing <br /> step. Should water from the four wells have met required <br /> standards, project closure will be requested of the appropriate <br /> regulatory agencies. This could occur in approximately December, <br /> 1993 . <br /> I <br /> I <br /> I <br />