Laserfiche WebLink
,. Mr. Edward C. Ralston <br /> December 3, 1993 <br /> Page Number 2 <br /> organics with a field operated photoionization detector (PID). Therewere no field <br /> indications of petroleum hydrocarbons in any of the soil samples. Therefore, no <br /> samples were submitted for laboratory analysis. The soils generated from the drilling <br /> activity are stored onsite in a 55-gallon drum pending laboratory analysis for disposal. <br /> Well MW-3A was developed on December 1, 1993 using a surge block and a bailer. <br /> The development water is stored onsite in a 55-gallon DOT-approved drum pending <br /> analysis for disposal. Groundwater samples will be obtained from,; the well for <br /> laboratory analysis during the regular quarterly monitoring program at the site. <br /> If you have any questions or comments, please give us a call at (510) '!416-2902. <br /> E <br /> Sincerely, <br /> b <br /> MITTEI_HAUSER CORPORATION '. <br /> G�0/ J <br /> o U1 <br /> Steven W. Pierce David J. Blunt <br /> I" Senior Hydrogeologist N° 4510 Geoscience Manager, RG #4516 <br /> SWP:DJBIdlp <br /> P2168H005.WP <br /> 4 qT� OF C AV-� <br /> Attachment: Figure 1 - Site Location Map <br /> Permit For Well MW-3A <br /> Figure 2 - Site Plan <br /> Boring for Well MW-3A <br /> Well Construction Details for Well MW-3A <br /> cc: Mr. Harlin Knoll, San Joaquin County Public Health Services <br /> E <br />